New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4091 CO3
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2008
>
GJN4091 CO3
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/20/2010 2:27:02 PM
Creation date
6/27/2008 10:29:21 AM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Contracts
PW_Active
No
External_View
No
GJN
004091
GL_Project_Number
945034
Identification_Number
2006100060
COE_Contract_Number
2006-00002
Retention_Destruction_Date
10/18/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
C{TY OF EUGENE <br /> DEPARTMENT OF PUBLIC WORKS <br /> ENGINEERING DIVISION <br /> mange Order Jobs 4091 <br /> Contrail • 2006A2 <br /> CONTRACTOR: Emu ene Sand b Gnwl Change Order e 1 <br /> <br /> • (ADDRESS) P.O. Box 1087 Dah: 01 /04!06 <br /> Eugene, OR 97440 CAMS Dab: <br /> Reviewed by: Dab: <br /> PROJECT: Judkins Polnt noM wldeninp of roadwrv along Glenwood Boulevard Inspector: Rav Remmers <br /> from the Intershh Hlphway north approximahN 700', wldeninp Exit 181 <br /> on/oR nmp from Glenwood BNd, nst approximabry 200' Prof . Mpr. John Bonham <br /> Prhwlpal EnB. Mfchelh Cehitl <br /> You are directed to make the following changes in this contract: <br /> Contract <br /> Item <br /> No. <br /> 260 ODOT Incurted lrafic control nsMctions <br /> This changes the bid items as follows: <br /> Contract Contract <br /> Item Tlme Ouantlty Unit Amended Net <br /> No. Item Chan a Units Cost Amount Chan a Chan e <br /> 280 ODOT incurred traffic control reaMedons Ori lost 0.00 ;0.00 ;0.00 ;0.00 <br /> Revised 0.00 0.00 0.00 <br /> Amended 1.00 LS 709.26 70916 3 709.26 <br /> Orl nal 0.00 0.00 0.00 ;0.00 <br /> Revised 0.00 0.00 0.00 <br /> Amended 0.00 0.00 0.00 0.00 <br /> Ori Inal 0.00 0.00 ,00 ;0.00 <br /> Revised 0.00 0.00 0.00 <br /> Amended 0.00 0.00 .00 0.00 <br /> Orl Inai 0.00 0.00 0.00 ;0.00 <br /> Revised 0.00 0.00 0.00 <br /> Amended 0.00 .DD 0.00 0.00 <br /> O IMI 0.00 0.00 0.00 ;0.00 <br /> Revised 0.00 0.00 0.00 <br /> Amended 0.00 .00 0.00 0.00 <br /> Ori Inal 0.00 0.00 0.00 ;0.00 <br /> Revised 0.00 0.00 .00 <br /> ' Amended 0.00 0.00 0.00 0.00 <br /> The original contract work days are 45.0 da <br /> The contract time change this C.O o.0 de <br /> The contract time change by previous C.O.'s 0.0 de <br /> The new contract work da are 45.0 de <br /> The original contract sum was ;176 371.20 <br /> _._.__.n_.. <br /> Net change by previous change order l73 L. 3 ~ ;ta6.25 <br /> Net change due to amendment by previous change order 3 3 `j 3 . ~O ;t,2so,oo <br /> _..._.__._._..._._.........._...._._....._..._......___r.______._..__...._._ <br /> The contract sum prior to this change order was <br /> st 7s,oza.ss <br /> This change order will change contract sum by this amount a 709.za <br /> The new contract net change sum <br /> 168.25 <br /> The new contract amendment sum /p . ;4,859.28 <br /> The new contract sum including this change order will be ;te2,737.9t <br /> Percents a of on lost contract <br /> NET CHANGE DU TO AMENDMENTS 3.61 % <br /> 2.D196 <br /> Approval by: <br /> City Engineer Prime Contractor Third Party <br /> Date Date Date <br /> CONTRACTOR ~ OFFICE FILE ~ PURCHAS1Nt3ICR0 <br /> 01FORMSIPROJECTICONSTIREVISEDCHANGE ORDER.XLS <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.