<br /> Appendix B: Preliminary Project Cost Estimate <br /> Judkins Point Interchange <br /> Glenwood Boulevard Improvements <br /> Preliminary Cost Estimate <br /> April 2002 <br /> Widen approx. 8001.f. Glenwood Blvd. $200,000 <br /> Widen approx. 200 l.f. NB off-ramp to Glenwood Blvd. $25,000 <br /> Excavation -Ditch and Backslope $12,500 <br /> Guardrail -Remove & Reconstruct approx. 400 l.f., Type 2A $10,000 <br /> Signal -Install conduit & junction boxes for future signal $2,500 <br /> TOTAL $250, 000 <br /> -8- <br /> <br />