• Page 3 <br /> <br /> Run Date: 10/12/2005 14:36:54 <br /> City of Eugene <br /> Contract Preliminary Progress Payment <br /> Payment No 001 <br /> Contractor: DELTA CONST. Original Contract: $242,907.66 <br /> Job 93-004111 Current Amount: $265,578.24 <br /> Contract No: 2006-00005 Contract Award Date: 07/25/2005 <br /> PO 2006050082 Completion Date: 10/11/2005 <br /> Assessable: No <br /> Current Contract Estimated Payment Cumulative Totals it Complete <br /> Line Description Last Cbng Ord Unit Price Unit Measure Quantity Amount Quantity Amount Quantity Amount <br /> 0180 REMOVE AND REPLACE MAILBOX $250.00 EACH 6-000 $1,500.00 3.000 $750.00 3.000 $750.00 50.00 <br /> 0190 EF03ANIQ4ENT' ST PAV $4.00 CUYD 120.000 $480.00 120.000 $480.00 120.000 $480.00 100.00 <br /> 0200 CONCRETE CROSSWALK 8" DOWELED $9.00 SQFT 441.000 $3,969.00 0.000 $0.00 0.000 $0.00 0.00 <br /> 0210 FLAGGING $38.00 HOUR 6.000 $228.00 0.000 $0.00 0.000 $0.00 0.00 <br /> 0220 AGGREGATE BASE, 10" DEPTH $6.40 SQYD 70.000 $448.00 0.000 $0.00 0.000 $0.00 0.00 <br /> 0230 AGGREGATE BASH, 12" DEPTH $7.60 SQYD 3,959.000 $30,088.40 0.000 $0.00 0.000 $0.00 M 0.00 <br /> 0240 CONCRETH WALKS, 4" DEPTH $3.20 SQFT 7,967.000 $25,494.40 0.000 $0.00 0.000 $0.00 0.00 <br /> 0250 CONCRETE DRIVEWAY, 5" DEPTH $3.75 SQFT 3,627.000 $13,601.25 0.000 $0.00 0.000 $0.00 0.00 <br /> 0260 RHTAINING WALL PREFABRICATED M $125 00 LINFT 40 000 $5 000.00 0.000 $0.00 0.000 $0.00 0.00 <br /> 0270 LEVEL 2 3/4" DENSE GRADED HMAC $43.75 TON 350.000 $15,312.50 0.000 $0.00 0.000 $0.00 0.00 <br /> 0280 LEVEL 2 1/2" DENSH GRADED HMAC $43.75 TON 350.000 $15,312.50 0.000 $0.00 0.000 $0.00 0.00 <br /> 0290 CONCRETE MANHOLE, 4"-12" PIPE, $2,275.00 EACH 1.000 $2,275.00 1.000 2,275.00 1.000 $2,275.00 100.00 <br /> 0300 CONCRETE MANHOLE, FLAT TOP, ST $2,300.00 EACH 5.000 $11,500.00 3.000 $6,900.00 3.000 $6,900.00 60.00 <br /> 0310 REVERSE SLOPE GUTTER, CONC. CO $26.70 LINFT 93.000 $2,483.10 0.000 $0.00 0.000 $0.00 0.00 <br /> 0320 CURB AND GUTTER, CONCRETE CURB $7.06 LZNFT 2,207,000 $15,581.42 0.000 $0.00 0.000 $0.00 0.00 <br /> 0330 AGGREGATE DRIVEWAY ADJUSTMNT $4.00 SQYD 200.000 $800.00 0.000 $0.00 0.000 $0.00 0.00 <br /> 0340 CONC. 12" AREA DRAIN W/GRATE $850.00 EACH 2.000 $850.00 0.000 $0.00 0.000 $0.00 0.00 <br /> 0350 TEMP ORANGE PLASTIC MESH PENCE $2.50 EACH 613.000 $1,532.50 219.000 $547.50 219.000 $547.50 36.00 <br /> 0360 1"DEPTH SUBGRADE STABILZATION 002 $26.00 SQ]'D 274.000 $4,384.00 274.000 $4,384.00 274.000 $4,384.00 100.00 <br /> 0370 6"DEPTH SUHGRADE STRBZLZATION 001 $9.00 SQYD 1,506.000 $13,554.00 1,506.000 $13,554.00 1,506.000 $13,554.00 100.00 <br /> <br />