Run Date: 01/09/2006 12:00:23 Page 3 <br /> City of Eugene <br /> Contract Preliminary Progress Payment <br /> Payment No 004 <br /> Contraotor: DELTA CONST. Original Contract: $242,907.66 <br /> Job 93-009111 Current Amount: $288,298.15 <br /> Contract No: 2006-00005 Contract Award Date: 07/25/2005 <br /> PO 2006050082 Completion Date: 10/11/2005 <br /> Assessable: No <br /> • Current Contract Estimated Payment Cumulative Totals 3 Complete <br /> Line Description Last Chng Ord Unit Price Ualt Measure Quantity Amount Quantity Amount quantity Amount <br /> 0180 REMOVE AND REPLACE MAILBOX $250.00 EACH 6.000 $1,500.00 3.000 <br /> $750.00 6.000 $1,500.00 100.00 <br /> 0190 EMBANKMENT ST PAV $4.00 CUYD 120.000 $480.00 0.000 $0.00 120.000 $480.00 100.00 <br /> 0200 CONCRHTH CR033XAL1C H" DONHLHD $9.00 EQPT 441.000 $3,969.00 0.000 $0.00 564.000 $5,076.00 128.00 <br /> 0210 FLAGGING $38.00 HOUA 6.000 $228.00 0.000 <br /> $0.00 0.000 $0.00 0.00 <br /> 0220 AGGREGATfi BASS, 10" DEPTH $6.40 SQYD 70.000 <br /> $448.00 0.000 $0.00 74.000 $473.60 106.00 <br /> <br /> 0230 AGGREGATE BASB, 12" DEPTH $7.60 SQYD 3 959 000 $30 088 40 0 000 $0 00 3 705 000 $2E 158 00 M 94 00 <br /> 0240 CONCRETB WALKS, 4" DEPTH $3.20 SQFT 7,967.000 $25,494.40 0.000 $0.00 8,197.000 $26,230.40 103.00 <br /> 0250 CONCRETE DRIVEWAY, 5" DEPTH $3.75 SQFT 3,627.000 $13,601.25 0.000 $0.00 3,929.500 $14,735.63 108.00 <br /> 0260 RETAINING WALL PRBFABRICATHD M $125.00 LINFT 40 000 $5 000 00 0 000 $0 00 39 000 $4 875 00 9E 00 <br /> 0270 LEVEL 2 3/4" DENSE GRADED HMAC $43.75 TON 350.000 $15,312.50 0.000 $0.00 388.000 $16,975.00 111.00 <br /> 0280 LEVEL 2 1/2" DENSE GRADED HMAC $43.75 TON 350.000 $15,312.50 0.000 $0.00 363.000 $15,881.25 104.00 <br /> 0290 CONCRETE MANHOLE, 4"-12" PIPE, $2 275.00 EACH 1 000 $2 275 00 0 000 $0 00 1 000 $2 275 00 100 00 <br /> <br /> 0300 CONCRETE MANHOLE, FLAT TOP, ST $2,300.00 EACH 5.000 $11,500.00 0.000 $0.00 5.000 $11,500.00 100.00 <br /> <br /> 0310 REVERSE SLOPE GUTTER, CONC. CU $26.70 LINFT 93.000 <br /> $2,483.10 0.000 $0.00 97.000 $2,589.90 104.00 <br /> <br /> 0320 CURB AND GUTTER, CONCRETE CURB $7.06 LINFT 2 207 000 $15 581 42 0 000 $0 00 2 117 000 $14 946 02 96 00 <br /> <br /> 0330 AGGREGATH DRIVEWAY ADJVSTMNT $4.00 SQYD 200.000 $800.00 0.000 $0.00 189.000 $756.00 95.00 <br /> <br /> 0340 CONC. 12" AREA DRAIN W/GRATH $850.00 EACH 1.000 $850.00 0.000 $0.00 0.000 $0.00 0.00 <br /> <br /> 0350 TEMP ORANGE PLASTIC MESH FENCE $2.50 EACH 613 000 $1 532 50 0 000 $0 00 219 000 $547 50 36 00 <br /> <br /> 0360 1"DEPTH SUBGRADE STABILZATION 001 $16.00 SQYD 274.000 $4,384.00 0.000 $0.00 274.000 $4,384.00 100.00 <br /> <br /> 0370 6"DEPTH SUBGRADS STABILZATION 001 $9.00 SQYD 1,506.000 $13,554.00 0.000 $0.00 1,506.000 $13,554.00 100.00 <br /> <br />