Run Date: 6/21/2005 <br /> Page 1 <br /> City of Eugene <br /> Bid Tabulation <br /> Bid #2005-000019 <br /> Job No. 93-004111 <br /> PAVING, CURB, GUTTERS, SIDEWALKS, AND STORM SYSTEM ON DEBRICK ROAD FROM CLINTON DRIVE TO VALLEY BUTTE DRIVE, AND AUTTE LANE FROM CLINTON DRIVE TO 700 FEET <br /> SOUTH <br /> Engineer's Estimate Delta Construction Eu ene Sand~el Wildish <br /> Cons_ traction <br /> Line <br /> No. Description uantit Unit Unit Price Amount Unit Price Amount Unit Price <br /> General Amount Unit Price Amount <br /> 10 MOBILIZATION 1 LUMPSUM $35,000.00 <br /> 20 TEMP PROTECTN/DIRECTN $35,000.00 $22,068.64 $22,066.64 $25,800.00 $25,800.00 $26,000.00 $26,000.00 <br /> 1 LUMPSUM $5,000.00 $5,000.00 $1,000.00 $1,000.00 $1,300.00 $1,300.00 $7,700.00 <br /> 30 EROSION CONTROL 1 LUMPSUM $3,000.00 $7,700.00 <br /> 40 CONCRETE CROSSWALK, COLORED 8", DOWELED $3,000.00 $1,000.00 $1,000.00 $1,800.00 $1,800.00 $5,000.00 $5,000.00 <br /> 180 SQFT $12.00 $2,160.00 $16.00 $2,880.00 $11.00 <br /> 50 EXCAVATION, GENERAL 2300 CUYD $1,980.00 $14.00 $2,520.00 <br /> $15.00 $34,500.00 $11.64 $26,772.00 $13.00 $29,900.00 $13.00 $29,900.00 <br /> 60 'SIGN, W/POST 3 EACH $200.00 <br /> 70 VALLEY GUTTER, STD $600.00 $250.00 $750.00 $200.00 $600.00 $200.00 $600.00 <br /> 116 LINFT $15.00 $1,740.00 $7,192.00 $29.00 <br /> 8U WEEPHOLE 100 LINFT $62.00 $3,364.00 $45.00 <br /> 90 TV INSPECTION $3.50 $350.00 $5.00 $500.00 $5,220.00 <br /> $9.00 $900.00 $z.oo SzoD.Oo <br /> 789 LINFT $1.00 $789.00 $1.40 $789.00 $1.00 <br /> 100 CURB INLET 4 A $769.00 $1.00 $789.00 <br /> 6 EACH $1,200.00 $7,200.00 $970.00 $5,820.00 $985.00 $5,91'J.00 $1,500.00 $9,000.00 <br /> 110 DRAIN PIPE PVC 10" 126 LINFT <br /> 120 DRAIN PIPE PVC 12" $35.00 $4,410.00 $?9.00 $3,654.00 $30.00 $3,780.00 $39.00 $4,914.00 <br /> 663 LINFT $40.00 $26,520.00 $30.65 $20,320.95 $30.00 <br /> 130 SIGN, REM/REPL 2 EACH $19,890.00 $45.00 $29,835.00 <br /> $100.00 $200.00 $200.00 $400.00 $170.00 $340.00 $300.00 $600.00 <br /> 140 MH ADJUST - SAN 2 EACH $800.00 <br /> 150 DITCH INLET TYPE D W/SUMP $1,600.00 $575.00 $1,150.00 $400.00 $800.00 $800.00 $1,600.00 <br /> 1 EACH $1,000.00 $1,000.00 $1,040.00 $1,040.00 $1,175.00 $1,175.00 $700.00 $700.00 <br /> 160 2"HMAC/6" AGG., DRIVEWAY ADJUSTNII~TT 41 SQYD $29.00 <br /> 170 CURB REMOVAL $1,148.00 $20.00 $820.00 $54.00 $2,214.00 $65.00 $2,665.00 <br /> 59 LINFT $8.00 $472.00 $5.00 $295.00 $3.00 <br /> 180 REMOVE AND REPLACE MAILBOX 6 EACH $177.00 $3.00 $177.00 <br /> $100.00 $600.00 $250.00 $1,500.00 $200.OG $1,200.00 $40U.C0 $2,4D0.00 <br /> 190 EMBANi'.MENT ST PAV 120 CUYD $9.80 <br /> 200.CONCRETE CROSSWALK 8" DOWELED $1,176.00 $4.0C $480.00 $6.00 $'120.00 $10.00 $1,200.00 <br /> 210 FLAGGING 441 SQFT $6.D0 $2,646.00 $9.00 $3,969.00 $9.00 $3,969.00 7.00 <br /> 6 HOUR $24.00 $ $3,087.00 <br /> 220 AGGREGATE BASE, 10" DEPTH $144.00 $38.00 $228.00 $50.00 $300.00 $40.00 $240.00 <br /> 70 SQYD $10.L'0 $700.00 $6.40 $448.OC $9.00 $630.00 $19.00 $1,330.00 <br /> 230 AGGREGATE BASE, 12" DEPTH ?959 SQYD <br /> $9.00 $35,631.00 $7.60 $30,088.40 $9.00 $35,631.00 $7,00 <br /> 240 CONCRETE WALKS, 4" DEPTH 7967 SQFT $27,713.00 <br /> $3.50 $27,884.50 $3.20 $25,494.40 $4.00 $31,868.00 $2.50 <br /> 250 CONCRETE DRIVEWAY, 5" DEPTH 3627 SQFT $19,917.SD <br /> $3.80 $13,782.60 $3.75 $13,601.25 $4.00 $14,508.00 $3.00 <br /> 260 RETAINING WALL PREFABRICATED MODULAR 40 LINFT $50.00 $10,881.00 <br /> 270 LEVEL 2 3/4" DENSE GRADED HMAC $2,000.00 $125.00 $5,000.00 $130.00 $5,200.00 $132.D0 $5,280.00 <br /> 350 TON $35.00 $12,250.00 $43.75 $15,312.50 $47.00 <br /> 280 LEVEL 2 1/2" DENSE GRADED HMAC 350 TON $16,450.00 $37.50 $13,125.00 <br /> 290 CONCRETE MANHOLE, 4"-12" PIPE, STM $40.00 $14,000.00 $43.75 $15,312.50 $47.00 $16,450.00 $37.50 $13,125.00 <br /> 1 EACH Sz,ooo.oo $2,000.00 Sz,z75.oo S2,z75.oo 51.450.00 S1,4F0.0D $2,Sno nn Sz,soa.o4 <br /> 300 CONCRETE MANHOLE, FLAT TOP, STM 5 EACH <br /> 310,REVERSE SLOPE GUTTER, CONC. CURB $1,800.00 $9,000.00 $2,3C0.00 $11,500.00 51,525.00 $7,625.00 $2,500.00 $12,500.00 <br /> 93 LINFT $10.50 5976.50 $26.70 $2,483.10 o- <br /> 320 CURB AND GUTTER, CONCRETE CURB $8.00 ,744.00 $15.00 $1,395.00 <br /> 2207 LINFT $9.00 $19,863.OC $7.06 $15,581.42 <br /> 330 AGGREGATE DRIVEWAY ADJUSTMNT $8.00 $17,656.00 $10.00 $22,070.00 <br /> 3~0 CG4C. 12" AREA DRAIN W/GRATE 200 SQYD $4.50 $900.00 $4.00 $BD0.00 $9.00 $1,800.00 <br /> 1 EACH $800.00 $10.00 $2,000.00 <br /> 3`0 TEMP ORAP'"' PLASTIC MESH FENCE $800.00 $850.00 $850.00 $1,000.00 $1,C08.00 $1,500.00 $1,500.00 <br /> <br /> Grand Total: ~ 613 EACH ~ $1.20 $735.60 $2.50 $1,532.50 <br /> Sz7o,77s.2o ` ,oD $1,226.00 $z.o$l,zz6.oo <br /> $242,907.66 ] $259,146.00 68,909.50 <br /> <br />