PUBLIC INFRASTRUCTURE Transportation Wastewater Stormwater Parks <br /> Are improvements identified in a Master Yes ? No ? Yes ? No ? Yes ? No ? Yes ? No a <br /> Plan or Capital Improvement Plan? <br /> Are improvements identified in Refinement Yes ? No ? Yes ? No a Yes ? No ? Yes ? No ? <br /> Plan or Special Study? <br /> Identified maintenance problem in the area? (From list of maintenance problems) Yes ? No ? <br /> <br /> This project may need: <br /> Geo-Technical Report Yes ? No ? <br /> Stormwater Drainage Study Yes ? No ? <br /> Open Waterway Exemption Yes ? No ? <br /> Rare Plant Survey Yes ? No ? <br /> Wetland Determination/Delineation Yes a No ? <br /> Special Flood Hazard Area Delineation & Base Flood Elevation Determination Yes D No ? <br /> Phase 1 Hazardous Material Site Assessment Yes ? No ? <br /> Involvement of Water Resource Team Yes ? No ? <br /> (because NRSS site, WEWP site, design considerations for alteration of or discharge to open waterway, <br /> possible rare plant, or water quality features) <br /> Other Issues to be addressed: <br /> Maintenance Division and Parks & Open Space Division Section <br /> <br />