l <br /> <br /> Run Date: 03/06/2006 09:16:36 Page 2 <br /> City of Eugene <br /> ,'t~ Contract Preliminary Progress Payment <br /> l PH}7ent No 001 <br /> Contractor: KSH CONSTRUCTION Original Contract: $80,080.00 <br /> Job 93-004101 Current Amount: $80,080.00 <br /> Contract No: 2006-00014 Contract Award Date: 01/18/2006 <br /> PO 2006100300 Completion Date: <br /> Assessable: No <br /> Current Contract Estimated Payment Cumulative Totals = Complete <br /> Line Description Last Chng Ord Unit Price Unit Measure Quantity Amount Quantity Amount Quantity Amount <br /> BSPSEL DRIVE PEDS3TRZl1N PATH <br /> Oeaeral <br /> 0000 Liquidated Damages ($400.00) DAY 0.000 $0.00 0.000 $0.00 0.00 <br /> 0010 MOBILIZATION $7,656.55 LUMPSUM 1.000 $7,656.55 1.000 $7,656.55 1.000 $7,656.55 100.00 <br /> 0020 CLfiARING ~ GRUBBING $7,700.00 LUMPSUM 1.000 $7 700.00 1.000 $7,700.00 1.000 $7,700.00 100.00 <br /> 0030 TEMP PROTfiCTN/DIRBCTN $4,000.00 LUMPSUM 1.000 $4,000.00 1.000 $4,000.00 1.000 $4,000.00 100.00 <br /> 0040 EROSION CONTROL $800.00 LUMPSUM 1.000 $800.00 1.000 $800.00 1.000 $800.00 100.00 <br /> 0050 CONCRETE 4" $3.45 SQFI' 11 595.000 $40,002.75 11,522.000 $39,797.45 11,522.000 $39,747,45 M 99.00 <br /> 0060 CONCRHTS 7" $3.95 SQFT 1,411.000 $5,573.45 1,520.000 $6,004.00 1,520.000 $6,004.00 108.00 <br /> 0070 DRAIN PIPS 8• 550.00 LTNPT 13.000 $650.00 44.000 $Z,Z00. 00 44.000 $2,200.00 338.00 <br /> Alterpate #1 <br /> 0080 CONCRETH 4• $3,05 SQFT 3,290.000 $10,034.50 2,236.000 $6,819.80 2,236.000 $6,819.80 M 68.00 <br /> 0090 ~ CONCRETE 7" $3.95 SQPT 345.000 $1,362.75 390.000 $1,540,50 390.000 $1,540,50 113,00 <br /> 0100 DRAIN PIPE 8" $25.00 LINFT 52.000 $1,300.00 50.000 $1,250,00 50.000 $1,250,00 96.00 <br /> 0110 SIGN PLACBMHNT $250.00 EACH 4.000 $1,000.00 4.000 $1,000,00 4.000 $1,000.00 100.00_ <br /> $80,080.00 $78,718.30 $78,718.30 <br /> <br />