Change Order Justification <br /> TRACTOR: 2G Construction Job # 4123 <br /> P.O. Box 11735 Contract # 2005-14 <br /> Eugene, OR 97440 Change Order # 2 <br /> PROJECT: Frank Kinney Park Renovation at 875 Martin Street <br /> Reason for Change Order: <br /> Contract <br /> Item <br /> No. <br /> 600 Perched water alon the east side of the side caused standin water in the valve box creatin otential for future failure of on-site controller <br /> in addition to washin out the north end of the mulch trail in this area. Additional drains a added and tied into existin stormwaler manhole <br /> to drain water awa from this area of the site. <br /> 610 Native Lawn seed did not fill in as was antici sled and Maintenance staff re nested additional seedin and establishment rior to final <br /> acre lance. <br /> 620 Low area on mulch ath flooded in winter des ite addition of drain i e underneath. Installation of area drain at i e entrance resolved the <br /> roblem. <br /> Justification of Price: <br /> Item Direct Date of Completed <br /> No. Assess. Work Document Date <br /> 600 Force Account X Price A reement <br /> '0 Force Account X Price A reement <br /> <br /> _ Force Account X Price A reement <br /> Force Account Price A reement <br /> Force Account Price A reement <br /> Force Account Price A reement <br /> <br />