New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4123 CO1
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2008
>
GJN4123 CO1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/20/2010 2:29:59 PM
Creation date
6/26/2008 2:28:20 PM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Contracts
PW_Active
No
External_View
No
GJN
004123
GL_Project_Number
935082
Identification_Number
2005100157
COE_Contract_Number
2005-00014
Retention_Destruction_Date
4/18/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CITY OF EUGENE <br /> DEPARTMENT OF PUBLIC WORKS <br /> Job E 4123 <br /> Change Order Contradr~ zoos-7a <br /> Change Order ~ 1 <br /> CONTRACTOR: 2G ConaWcdon Date: 12/75/2004 <br /> (ADDRESS) P.O. Box 11735 CAM Date: <br /> Eugene, OR 97440 <br /> Reviewed b . Date: <br /> Ina odor. A. to en <br /> PROJECT: Frank Kinnev Park Renovation et 878 Martin Street K. Finnev <br /> Prot. Mar. E. Proudfoot <br /> Principal Eng. M. Cahill <br /> <br /> You are directed to make the following changes in this contract: <br /> <br /> Contact <br /> <br /> Ibm <br /> No. <br /> 570 Install additional otable water backflow reventfon device ea re uired b lumbin ins or <br /> 580 Lawn base mix installation. <br /> 590 Art file block out installation at la round <br /> This changes the bid items as follows: <br /> (tract Contract <br /> Item Time Quantity Unit Amended Net <br /> No. Item Chan a Units Cost Amount +l- Chan a Chan e <br /> 570 Ad itional potable water double check Ori Inal 0.00 0.00 0.00 0.00 <br /> valve required by plumbing Inspector Revised 0.00 0.00 0.00 <br /> Amended 1.00 LS .89 468.89 468.89 <br /> 580 Lawn base mix Ori Ina 0. 0 0.00 0. 0.00 <br /> Revsed 0.00 0.00 0.00 <br /> Amended 1.00 LS 3 352.87 3 352.87 3 352.87 <br /> 590 Art file block out install Ori anal 0.00 0.00 0.00 0.00 <br /> Revised 0.00 0.00 0.00 <br /> Amended 1.00 LS 412.43 12.43 12.43 <br /> ins 0.00 0.00 0.00 0.00 <br /> Revised 0.00 0.00 0.00 <br /> Amended 0.00 0.00 0.00 0.00 <br /> ins 0.00 0.00 0.00 0.00 <br /> Revised 0.00 0.00 0.00 <br /> Amended 0.00 0.00 0.00 0.00 <br /> ins 0.00 0. 0.00 0.00 <br /> Revised 0.00 0.00 0.00 <br /> Amended 0.00 0.00 0.00 0.00 <br /> . original contrail work days are 0.0 da . <br /> The contrail time change this C.O o.o da <br /> The contrail time change by previous C.O.'s o.o da <br /> The new contract work da s are o.o da <br /> The original contract sum was 5264.oa8.1o <br /> Net change by previous change order <br /> ao.oo <br /> Net change due to amendment by previous change order 50.00 <br /> The contracf sum prior to this change order was <br /> Szsa,oa8.7 0 <br /> This change order will change contrail sum by this amount <br /> 54.234.1 s <br /> The new contrail net change sum <br /> 50.00 <br /> The new contract amendment sum <br /> 54,234.19 <br /> The new contract sum including this change order will be ~26e,2e2.29 <br /> Percents a of on last contract _ 7.gp~~ <br /> N CHANGE DUE TO AMENDMEN 5 1. °yo <br /> Approval by: <br /> City Engineer Prime Contractor Third Party <br /> Date Date Date <br /> CONTRACTOR ~ OFFICE FILE ~ PURCHASING/CRO <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.