<br /> Bun Date: 10/0420041_:34 _ ~ 2 <br /> City of Hugene <br /> Contract Preliminary Progress Payment <br /> Payment No 001 <br /> Contractor: 2G C~iSTRUCTION Original Contract: $264,048.10 <br /> Job * 93-004123 ~ Current Amount: $264,048.10 <br /> Contract No: 2005-00014 Contract Award Date: 09/15/2004 <br /> pO 2005050162 Completion Date: 12/01/2004 <br /> Assessable: No <br /> Current Contract Hstimated Payment Cumulative Totals • Complete <br /> Line Description Last Chug Ord Uait Price Uait Measure Quantity Amount Quantity Amount Quaat ity Amount <br /> PRANK T.IlII1ST PAR[ <br /> General <br /> 0000 Liquidated Damages ($750.00) DAY 0.000 $0.00 0.000 $0.00 0.000 $0.00 0.00 <br /> 0010 MOBILIZATION $48,238.24 LUMPSUM 1.000 $48,238.24 0.000 $0.00 0.000 $0.00 M 0.00 <br /> 0020 TRSH pgBSSRVATION PSHCING $3 56 LINPT 1 375.000 $4 895.00 901.000 $3,207.56 901.000 $3,207.56 66.00 <br /> 0030 BROSION CONTROL $2,442.00 LUMPSUM 1.000 $2,442.00 0.250 $610.50 0.250 $610.50 25.00 <br /> 0040 CONSULTATION, ARBORIST $111.87 HOUR 10.000 $1,118.70 0.000 $0.00 0.000 $0.00 0.00 <br /> 0050 ROUGH GRADING PLAY ARBA AND $0 26 SQFT 20 800 000 $5 408.00 0.000 $0.00 0.000 $0.00 0.00 <br /> 0060 HXCAVATION AND HAULING, PLAY A $28.17 CUYD 130.000 $3,662.10 24.000 $676.08 24.000 $676.08 18.00 <br /> 0070 FINB GRADING $0.09 SQFT 13,650.000 $1,228.50 0.000 $0.00 0.000 $0.00 0.00 <br /> 0080 CONCRHTB 5 5 $5 93 SQPT 3 200 000 $18 976.00 0.000 $0.00 0.000 $0.00 0.00 <br /> 0090 MON STRIP, 9• CONCRHTH $16.39 LII7PT 260.000 $4,261.40 0.000 $0.00 0.000 $0.00 0.00 <br /> 0100 12• WIDB CONCRHTB PLAY ARHA 8p $16.37 LINPT 325.000 $5,320.25 0.000 $0.00 0.000 $0.00 0.00 <br /> oleo CONCRH'PS Access RAMP w/ TRUNCA $eo7 0o HACx z o00 $1 614.00 0.00o So.oo o.ooo So.oo o.oo <br /> 0120 PLAY ARHA ACCESS RAMP $237.00 EACH 1.000 $237.00 0.000 $0.00 0.000 $0.00 0.00 <br /> 0130 CORH AND GUTTHR RBMOVH $6.42 LINFT 70.000 $449.40 0.000 $0.00 0.000 $0.00 0.00 <br /> 0140 CONSTRUCT RHVBRSH CURB AND GUT $26 00 LINFT 75 000 $1 950.00 0.000 $0.00 0.000 $0.00 0.00 <br /> 0150 CONCRBTS 7• $5.74 SQPT 360.000 $2,066.40 0.000 $0.00 0.000 $0.00 0.00 <br /> 0160 DISABLBD ACCHSS PARKING STRIPI $880.00 LUMPSUM 1.000 $880.00 0.000 $0.00 0.000 $0.00 0.00 <br /> 0170 DISABLHD ACCBSS SIGN $218 00 BACH 1 000 $218 00 0.000 $0.00 0.000 $0.00 0.00 <br /> 0180 BOUND AGGRHGATB PATH $4.20 SQFT 2,425.000 $10,185.00 0.000 $0.00 0.000 $0.00 0.00 <br /> 0190 MULCH PATH RHCONSTRUCTION $1.85 SQPT 3,885.000 $7,187.25 2,507.000 $4,637.95 2,507.000 $4,637.95 65.00 <br /> 0200 MULCH PATH RHCONSTRUCTION HX $1 22 SQPT 3 000 000 $3 660.00 2 850.000 $3 477.00 2,850.000 $3 477.00 95.00 <br /> 0210 RUBHHR SURFACING AND CONCRHTH $30.86 SQFT 375.000 $11,572.50 0.000 $0.00 0.000 $0.00 0.00 <br /> <br />