Run Date: 11/09/2005 10:35:07 <br /> City of Eugene Page 4 <br /> Contract Preliminary Progress Payment <br /> Payment No 010 <br /> Contractor: 2G CONSTRUCTION <br /> Job 93-004123 Original Contract: $264,048.10 <br /> Contract No: 2005-00014 Current Amount: $271,141.09 <br /> PO 2005050182 Contract Award Date: 09/15/2004 <br /> Assessable: No Completion Date: 12/01/2004 <br /> Line Description Current Contract Estimated Payment Cumulative Totals 8 Complete <br /> Las[ Cbng Ord Unit Price Unit Measure Quantity Amount Quantity Amount Quantity Amount <br /> 0380 PROVIDE AND INSTALL KOMPAN GAL $7,109.00 EACH <br /> l.ooo $7,109.00 0.000 $o.DO l.ooo $7,109.00 loo.oo <br /> 0390 PROVIDE AND INSTALL ROMPAN RAC $1,902.00 MACH <br /> 1.000 $1,902.00 0.000 $0.00 1.000 $1,902.00 100.00 <br /> 0400 GAMETIME T-SWING - INSTALL ONL $323.00 EACH <br /> 1.000 $323.00 0.000 $0.00 1.000 ~ $323.00 100.00 <br /> 0410 DYNACUSHION ON CONCRETH BASH $472.00 HACH <br /> 2.000 $944.00 0.000 $0.00 2.000 $944.00 100.00 <br /> 0420 GAMETIMH STRSTCE;ING STATION EQ $575.00 LUMPSDM <br /> 1.000 $575.00 0.000 $0.00 1.000 $575.00 100.00 <br /> 0430 IRRIGATION SYSTEM $18,656.00 LUMPSUM <br /> 1.000 $18,656.00 0.000 $0.00 1.000 $18,656.00 100.00 <br /> 0440 POTABLH WATHR LINE AND SHUT OF 4.43 LINFT <br /> 160.000 $708.80 0.000 0.00 140.000 $620.20 88.00 <br /> 0450 5' DBCIDUOUS TREE $158.00 BACH <br /> 5.000 $790.00 0.000 $0.00 5.000 $790.00 100.00 <br /> 0460 1.5" CAL. DHCIDUOUS TREE $160.75 EACH 43.000 <br /> $6,912.25 0.000 $0.00 42.000 $6,751.50 98.00 <br /> 0470 5' CONIFER TREE $131.00 EACH <br /> 0480 5 6.000 $786.00 0.000 <br /> GALLON SHRUB $0.00 6.000 $786.00 100.00 <br /> $23.23 EACH 17.000 $394.91 0.000 $0.00 17.000 $394.91 100.00 <br /> 0490 3 GALLON SHRUB $21.52 EACH <br /> 84.000 $1,807.68 0.000 $0.00 84.000 $1,807.68 100.00 <br /> 0500 1 GALLON SHRUB $9.46 EACH <br /> 87.000 $823.02 0.000 $0.00 89.000 $841.94 102.00 <br /> 0510 PERENNIALS 6, GRASSES $8 70 EACH <br /> 95.000 $826.50 0.000 $0.00 95.000 $826.50 100.00 <br /> 0520 4" GROUND COVER fi PERENNIALS $4.35 EACH <br /> 108.000 $469.80 0.000 $0.00 108.000 $469.80 100.00 <br /> 0530 LOAM PLACEMENT AND GRADING $17.27 CUYD <br /> 200.000 $3,454.00 0.000 $0.00 13.500 $233.15 7.00 <br /> 0540 SHRUB BED PREPARATION $0.55 SQFT 3,750.000 <br /> $2,062.50 0.000 $0.00 3,696.000 <br /> 0550 TYPE 'B' MULCH $20.35 CUYD $2,032.80 99.00 <br /> 50.000 $1,017.50 0.000 $0.00 15.000 $305.25 30.00 <br /> 0560 SEEDING $0.28 S FT <br /> 10,750.000 $3,010.00 0.000 $0.00 11 264.000 <br /> <br /> 0570 POTABLE WATER CHECR VALVE 001 $468.89 LUMPSUM $3,153.92 105.00 <br /> 1.000 $468.89 0.000 <br /> $0.00 1.000 $468.89 100.00 <br /> <br />