New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4123 Schirmer, Schlesinger & Assoc Contract
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2008
>
GJN4123 Schirmer, Schlesinger & Assoc Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/11/2011 10:08:00 AM
Creation date
6/26/2008 2:16:59 PM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Contracts
PW_Active
No
External_View
No
GJN
004123
GL_Project_Number
935082
Identification_Number
2004100580
COE_Contract_Number
90656-99-003
Retention_Destruction_Date
4/18/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Bridge abutment -Engineer drawing and calculation <br /> Details (provided by the City of Eugene) <br /> Specification (provided by the City of Eugene) <br /> Notes (provided by the City of Eugene) <br /> <br /> ¦ Irrigation Plan <br /> Layout of all irrigation heads (size and spray pattern), lateral lines (size and location), main line (size and <br /> location), irrigation zones, controller and specifications. <br /> ¦ Deliverable - 24236 Tree Irrigation Plan <br /> Details (provided by the City of Eugene) <br /> Specification (provided by the City of Eugene) <br /> Notes (provided by the City of Eugene) <br /> ¦ Planting Plan -For site planting <br /> Locate and specify all plant material. A final plant list (including plant names, quantities, and size) will be <br /> included with the planting plan. Specifications. <br /> ¦ Deliverable - 24x36 Planting Plan <br /> Details (provided by the City of Eugene) <br /> Specification (provided by the City of Eugene) <br /> Notes (provided by the City of Eugene) <br /> ¦ Miscellaneous <br /> Some time is included in this proposal for client meetings (90% set and a 100% set) and coordination. <br /> We foresee the following time line for the deliverables: <br /> • 60% completion -completed by City of Eugene <br /> • 90% completion -May 28, 2004 <br /> • 100% completion -June 16, 2004 <br /> We will provide the city with a bond paper set for each of the above review stages (90% and 100%). The final <br /> deliverables will include a complete vellum copy and a digital copy (ACAD2000) of the entire construction set. <br /> Construction Documents <br /> Based on the approved design development documents and any fizrther adjustments in the scope or quality of the <br /> project or in the construction budget authorized by the owner, Schirmer, Schlesinger + Associates Inc. shall <br /> prepare for approval by the owner a construction document set of drawings consisting of drawings and <br /> specifications setting forth in detail the requirements for the construction of the project. The construction drawing <br /> set will include, but is not limited to, a site plan, foundation plan, layout plan, grading plan, construction details, <br /> lighting plan, and a planting. Schirmer, Schlesinger + Associates Inc. shall assist the owner with any filing of <br /> documents required by the local government agencies for permit purposes for the construction of the project. <br /> • Total Cost Construction Documents x9825.00 (not to exceed) <br /> Construction Documents $9825.00 (not to exceed) ~ vi~ <br /> _ _ <br /> Schoening Date <br /> City Engineer <br /> Sincerely, <br /> Schirmer, Schlesinger + Associates, Inc. <br /> Carol Schirmer <br /> Principal <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.