New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4166 MR Richards Contract
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2008
>
GJN4166 MR Richards Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/18/2011 11:07:42 AM
Creation date
6/26/2008 1:23:05 PM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Contracts
PW_Active
No
External_View
No
GJN
004166
GL_Project_Number
945225
Identification_Number
2004100420
COE_Contract_Number
2004-00234
Retention_Destruction_Date
7/5/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
q'~f. <br /> :~in~{: . i <br /> M, I M D G N E! I C <br /> 99 WEST /Dth AVBNIIB SPITE 395 Eu<trBNE OR 974D1 <br /> 541-6a7-0129 FAX b41-687-D 133 <br /> www.mrrichards.com <br /> .PROPOSAL <br /> TO: Mike Shields, City of Eugene Public Works <br /> DATE: February 4, 2004 <br /> PROJECT: Division Pum~pp Station <br /> C:r N '-t l b 6 <br /> DESCRIPTION: <br /> A new wastewater pump station Is to be constructed near the intersection of Division Street and <br /> Lone Oak Street In Eugene, Oregon. The pump pit w~11 be constructed as a sunken caisson. A <br /> connection will be made to the existing adjacent pump pit. The caisson is to be approximately <br /> 12 feet in diameter and 30 feet deep. <br /> SCOPE OF WORK: <br /> M. R. Richards Engineering Inc. proposes to provide structural engineering services for the Division <br /> Pump Station project. The work will include review of the existing construction documents, site <br /> visits, structural analysts, design, preparation of construction drawings end preparation of technical <br /> specifications. Construction period services will include response to contractor questions, review <br /> of shop drawings end site visits at appropriate Intervals. Drawing and other documents will be <br /> <br /> .prepared for schematic, design development, 75°k construction documents and 100% construction <br /> document submittals. <br /> FEE: <br /> Compensation is to be based on time and expenses in accordance with the firms' current fee schedule, <br /> attached. The total fee for services Is not-to-exceed $4,500.00 without prior arrangements. <br /> 'Reimbursable expenses are estimated to be $500.00. Additional or extra services, if required, will be <br /> invoiced in accordance with the firms' current fee schedule. <br /> TERMS AND CONDfT10NS: <br /> I!n accordance with AIA document C141 or a mutually agreed upon alternative. Cost estimation is not <br /> included. Sign cant changes (n project size or complexity may require that this proposal be <br /> <br /> renegotiated. <br /> ,c,~`~ z.-~~ <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.