New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4166 ITT Flygt PMT 1
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2008
>
GJN4166 ITT Flygt PMT 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/18/2011 11:07:42 AM
Creation date
6/26/2008 1:16:55 PM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Invoices-Payments & Receivables
PW_Active
No
External_View
No
GJN
004166
GL_Project_Number
945225
Identification_Number
2007100285
Retention_Destruction_Date
7/5/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Jao.26. 2001 2:27PM No.0419 P. 1/3 <br /> <br /> ~ ' <br /> . d ITT Flyg! Gotpnratlon <br /> ITT 2b3U North Mml~s nr/ve <br /> Pt~rtlcmd, Ult 97217 ? <br /> Tel.: (3~3) ?40-/980 x107 ~ <br /> Jr'nRineered for life Fax.: (.5113) 24(1-3445 <br /> . ~mutl.• udr+m.shan/run~a ttt.ram <br /> Pnge 1 of 3 ~ <br /> t <br /> January 2G, 2007 <br /> City of Rugene <br /> Phone: (S41) G82-5300 <br /> Fax: (541) 682-$410 <br /> Dear J oho Bonham, I <br /> We aro plerjxe to pruvida the fi~llawing cluatatian for the Try do Bay pumps in Eugene. <br /> . 7 <br /> i <br /> 2 ea. ITT Flygt Submersible Sewage Pump, Modal; NP3171.U91/454, 4" discharge size, 3U HP ! <br /> i <br /> explosion proof motor rated Class 1 Div 1 c~roups~ CBtD, QfiOV-3T'H-bUHZ, 50' of <br /> power/signal cable, FLS leakage sensor, motor temperature sensor;. <br /> 2 ea. 1TT Flygl Mini-C:AS 12U Relay, far monitoring of pump leakage sensor and motor 1 <br /> lempemlure •xensors, pawarad by 12UVAC rn' 24VAC/VDC, installation in pump control <br /> panel by others. <br /> 1 lot 1 llay On Sitc Startup Assistance and 'Training, by factory technician. Additional clays <br /> billed at $ 761i.t)U per day. <br /> • TUTAi~, for above listed Pump and Accessories. 531,66q.0U <br /> NQTE: • <br /> This quotation is for a "Try and Ruy"which will he handled in the fallowing manor. <br /> 1) City of Bugene (The City) issues 1'1"!' Flygt a purchase order !iri the cluvlcd equipment ~ <br /> with a 90 day trial period. <br /> 2) if during the trial period the pump fails to perform properly (malfunction or clog), '!'he <br /> City may return the equipment, cancel the P.O, said owe nothing. <br /> 3) iJpon completian al'tha trial period assuming the pampa arc operating properly, The <br /> City will promptly make payment in full. <br /> 4) The installation of the equipment is the responsibility at'Tha City. 1TT Flygt will <br /> however provide on <br /> site assistance with the installation and a~larlup of the supplied <br /> equipment. <br /> f <br /> This qualatian is based nn using the existing ABS guide rail system. 17iachargc flanges on above <br /> noted 'pumps to be drilled to accept the 4" sliding bracket li~am the existing A13S pumps. i <br /> iTT l~lygt standard terrna 8c conditions apply except as noted above. <br /> FQB origin, freight prepaid to,jobaltc. <br /> • i <br /> } <br /> r <br /> . ~ <br /> 01/28/200T FRI 15:30 [TX/RX NO 8208] I~ 001 <br /> i <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.