New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4166 Elcon Contract
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2008
>
GJN4166 Elcon Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/18/2011 11:07:41 AM
Creation date
6/26/2008 1:13:46 PM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Contracts
PW_Active
No
External_View
No
GJN
004166
GL_Project_Number
945225
Identification_Number
2004100563
COE_Contract_Number
2004-00244
Retention_Destruction_Date
7/5/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
l <br /> Elcon Associates, Inc. Page 5 <br /> Estimate For Engineering Services <br /> Project: City of Eugene, Division Pump Station Project <br /> Date:April 29, 2004 <br /> Revision 1 <br /> <br /> ` Expenses Predesign Design Construction <br /> Travel <br /> $200.00 <br /> Per Diem <br /> Blue Lines Reproduction <br /> erox Re roduction <br /> Telephone Long Distance <br /> Fax Transmissions <br /> Postage, Courier $100.00 $100.00 <br /> Computer usage <br /> Photographs <br /> Plotting <br /> Other <br /> Subtotal Expenses: _ $0.00 $100.00 $300.00 <br /> Project Labor: $0.00 $28,602.00 $9,789.00 <br /> Subtotal b Phase: $0.00 $28 702.00 $10 089.00 <br /> Travel - At cost <br /> SUMMARY: ENGINEEERING COSTS <br /> Total Project Expenses: $400.00 <br /> Total Project Labor: $38,391.00 <br /> Total Estimated Fee: $38 791.00 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.