l <br /> Elcon Associates, Inc. Page 5 <br /> Estimate For Engineering Services <br /> Project: City of Eugene, Division Pump Station Project <br /> Date:April 29, 2004 <br /> Revision 1 <br /> <br /> ` Expenses Predesign Design Construction <br /> Travel <br /> $200.00 <br /> Per Diem <br /> Blue Lines Reproduction <br /> erox Re roduction <br /> Telephone Long Distance <br /> Fax Transmissions <br /> Postage, Courier $100.00 $100.00 <br /> Computer usage <br /> Photographs <br /> Plotting <br /> Other <br /> Subtotal Expenses: _ $0.00 $100.00 $300.00 <br /> Project Labor: $0.00 $28,602.00 $9,789.00 <br /> Subtotal b Phase: $0.00 $28 702.00 $10 089.00 <br /> Travel - At cost <br /> SUMMARY: ENGINEEERING COSTS <br /> Total Project Expenses: $400.00 <br /> Total Project Labor: $38,391.00 <br /> Total Estimated Fee: $38 791.00 <br /> <br />