Elcon Associates, Inc. Page 3 <br /> Estimate For Engineering Services <br /> Project: City of Eugene, Division Pump Station Project <br /> Date:Apri129, 2004 <br /> Revision 1 <br /> Construction Services Budgeted Labor By Category in Manhours <br /> Project Senior Senior CADD <br /> Principal Manager Engineer Engineer Designer Designer Technical Operator Accountant Clerical Total <br /> i. Project Admin. 3 2 5 <br /> 2. Meetings and Conferences 0 <br /> 3. Bidding Assistance 4 4 <br /> 4. Pre-Bid Meeting 0 <br /> 5. Handle Subs'tion Requests 2 2 <br /> 6. Addenda Preparation 4 4 <br /> 7. Preconstruction Conf. 0 <br /> 8. Construction Meetings 0 <br /> 9. Review Chng Order Prop's. 2 2 <br /> 10. Clarifications 4 4 <br /> 11. Submittal Review 40 40 <br /> 12. Const Observation(1) g 8 <br /> 13. Field Reports 4 4 <br /> 14. Testing and Test Re orts 0 <br /> 15. Punchlist <br /> 0 <br /> 16. Final Inspection 0 <br /> 17. As-Builts Drawng 6 8 14 <br /> 18.0&M manual/Elect 0 <br /> 19. Quality Control 0 <br /> 20. <br /> 0 <br /> Total Labor for Construction Svcs.: 0 3 74 0 0 0 0 8 0 2 87 <br /> <br /> Est_Eugene Division PS.xls <br /> <br />