Run Date: 01/29/2003 09:28:17 City of Eugene <br /> Estimate Distribution <br /> Estimate: GJN Estimate <br /> Job 93-004144 AIRPORT - AIRFIELD EQUIPMENT STORAGE BUILDING <br /> Line No. Description Quantity Unit Unit Price Amount <br /> <br /> AIRPORT - AIRFIELD EQUIPMENT STORAGE BUILDING <br /> General <br /> 0020. Building 1.00 EACH $204,000.00 $204,000.00 <br /> Total General S204,000.00 <br /> Total AIRPORT - AIRFIELD EQUIPMENT STORAGE BUILDING $204,000.00 <br /> AIRPORT - AIRFIELD EQUIPMENT STORAGE BUILDING - Othor / Direct <br /> General ' <br /> 0010. Testing 1.00 LUMPSUM $2,000.00 $2,000.00 <br /> 0020. Contingency 1.00 LUMPSUM $20,000.00 $20,000.00 <br /> 0030. Advertising 1.00 LUMPSUM 51,000.00 $1,000.00 <br /> 0040. Consultants 1.00 LUMPSUM $33,000.00 $33,000.00 <br /> 0050. Permits 1.00 LUMPSUM $2,000.00 $2,000.00 <br /> 0060. Administration 1.00 LUMPSUM $3,000.00 $3,000.00 <br /> Total General $61,000.00 <br /> Total AIRPORT - AIRFIELD EQUIPMENT STORAGE BUILDING - Other / Direct $61,000.00 <br /> AIRPORT - AIRFIELD EQUIPMENT 3TORAGE BUILDING - Miscellaneous <br /> General <br /> 0010. Engineering Charge 1.00 LUMPSUM $10,000.00 510,000.00 • <br /> Total General $10,000.00 <br /> Total AIRPORT - AIRFIELD EQUIPMENT STORAGE BUILDING - Miscellaneous $10,000.00 <br /> Total GJN Estimate $275,000.00 <br /> <br />