• ~r <br /> <br /> ~ <br /> Traffic Crossing on Franklin at Alder <br /> Mob Is 1 7000 7000 <br /> Traffic Control Is 1 3500 3500 <br /> Sawcut If 1100 1.25 1375 <br /> Excavation cy 200 50 10000 <br /> curb n gutter If 500 14 7000 <br /> 4"walk sf 2800 3.5 9800 <br /> 5" walk sf 216 3.75 810 <br /> Conc. Median sf 330 6 1980 <br /> Striping If 200 3 600 <br /> Ramps ea 4 300 1200 <br /> signs and post ea 4 100 400 <br /> Landscape Is 1 2500 2500 <br /> Erosion Control) Is 1 2000 2000 <br /> 48165 <br /> 20% contingency 9633 <br /> 57798 <br /> 23% Engineering 13293.54 <br /> Total 71091.54 <br /> TC <br /> <br />