New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4137 Walkway-Bikeway Agreement 20564
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2008
>
GJN4137 Walkway-Bikeway Agreement 20564
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2008 8:13:56 PM
Creation date
6/26/2008 11:26:53 AM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Correspondence
PW_Active
Yes
External_View
No
GJN
004137
GL_Project_Number
935224
Identification_Number
2004100003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Franklin @ Alder Pedestrian Crossing, Eugene <br /> f; ~ ifs <br /> « ~ <br /> r; <br /> r ~ , <br /> x <br /> r i - ~ i'P' <br /> 4r rr, ~ ~ s <br /> '.s ~ ~ ~,a <br /> H - <br /> ' ~ <br /> ~y <br /> i. <br /> ` ~ <br /> 4 <br /> <br /> i <br /> i. <br /> ti. ~ • <br /> - <br /> 1. Construct pedestrian refuge island 12' wide with 10' cut-through; ladder bar crossing. <br /> 2. Rebuild corner to realign new access ramps. <br /> 3. Construct new access ramp for Alder crossing. <br /> 4. Install advance stop bars at appropriate locations. <br /> 5. Remove drive, extend setback sidewalk and curb and gutter from east. <br /> 6. Install new access ramp. <br /> 7. Install standard driveway, widen existing 3-1/2' wide curbside sidewalk by 4 - 5' for 150'. <br /> 8. Install 200' curb and utter, and setback or curbside sidewalk 6-7' wide as <br /> 9 <br /> right-of-way allows. <br /> I <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.