Franklin @ Alder Pedestrian Crossing, Eugene <br /> f; ~ ifs <br /> « ~ <br /> r; <br /> r ~ , <br /> x <br /> r i - ~ i'P' <br /> 4r rr, ~ ~ s <br /> '.s ~ ~ ~,a <br /> H - <br /> ' ~ <br /> ~y <br /> i. <br /> ` ~ <br /> 4 <br /> <br /> i <br /> i. <br /> ti. ~ • <br /> - <br /> 1. Construct pedestrian refuge island 12' wide with 10' cut-through; ladder bar crossing. <br /> 2. Rebuild corner to realign new access ramps. <br /> 3. Construct new access ramp for Alder crossing. <br /> 4. Install advance stop bars at appropriate locations. <br /> 5. Remove drive, extend setback sidewalk and curb and gutter from east. <br /> 6. Install new access ramp. <br /> 7. Install standard driveway, widen existing 3-1/2' wide curbside sidewalk by 4 - 5' for 150'. <br /> 8. Install 200' curb and utter, and setback or curbside sidewalk 6-7' wide as <br /> 9 <br /> right-of-way allows. <br /> I <br /> <br />