New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4137 Ford & Assoc PMT 2
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2008
>
GJN4137 Ford & Assoc PMT 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2008 8:13:44 PM
Creation date
6/26/2008 11:24:05 AM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Invoices-Payments & Receivables
PW_Active
Yes
External_View
No
GJN
004137
GL_Project_Number
935224
Identification_Number
2004100003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
~ FORD & ASSOCIATES ~ <br /> <br /> r • <br /> `LAND SURVEYING ¦ CONSTRUCTION SUPERVISION ¦ WATER RIGHTS EXAMINATIONS <br /> January 10, 2004 <br /> Mr. Terry Colvin, Project Manager <br /> City of Eugene, Public Works Engineering <br /> 244 E. Broadway <br /> Eugene, OR 97401 <br /> RE: Project Billing Summary and Proposal for Additional Fee for <br /> Pedestrian Refuge, Sidewalk and Access Ramp Improvements <br /> City Job # 4137. <br /> Dear Terry: <br /> Thank you for giving Ford & Associates the opportunity to provide design services to the <br /> City of Eugene for improvements that include a new driveway, sidewalk, refuge island on <br /> Franklin Boulevard, and access ramps at the intersection of Alder Street. <br /> This letter summarizes our billing for these services. We also summarize proposed <br /> additional services that may arise. <br /> Project Budget Update <br /> To date, the Oregon Department of Transportation has received an Access Permit <br /> application, which included the construction drawings for the improvements. We have <br /> spent $17,333.70 to date on these efforts. Our original contract amount was $17,950. <br /> Our services included coordination of the design with the City of Eugene engineering and <br /> planning staff, as well as the Oregon Department of Transportation. <br /> Recently, ODOT requested additional information, which is being assembled by the City <br /> and our office. <br /> Description of Overage Amount <br /> The overage amount to date totals $3,348.75. <br /> The majority of the overage amount is attributed to research required to write easements <br /> and the Joint Access and Maintenance Agreement required by the Access permit <br /> application. This work was not included in the original contract but was approved in order <br /> to expedite the submittal of the application. Considerable time was spent facilitating <br /> communication between property owners and their legal representatives in preparation for <br /> a Joint Access and Maintenance Agreement and other easements. The easements and <br /> agreement were written by Jim Colton, PLS, in our office. <br /> The overage amount also includes time for revisions to plan sheets due to the reduction <br /> of the original scope of new sidewalk construction as well as time allocated for a redesign <br /> the access ramps. <br /> The current billing results in a total of $20,682.45 <br /> P.O. Box 22735 ~ Eugene, OR 97402 ~ (541) 344-1852 ~ Fax (541) 344-9923 <br /> E-mail: mail@fnfinc.net¦ Web site: www.fnfinc.net <br /> Certified W.B.E. / D.B.E. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.