. 1~ <br /> Run Date: 09/07/2005 14:18:17 <br /> Page 2 <br /> City of Eugene <br /> Contract Preliminary Progress Payment <br /> Payment No 003 <br /> Contractor: 2G CONST. Original Contract: $597,322.25 <br /> Job 93-004151 Current Amount: $602,225.13 <br /> Contract No: 2005-00025 Contract Award Date: 05/23/2005 <br /> PO 2005050480 Completion Date: 11/01/2005 <br /> Assessable: No <br /> Current Contract Estimated Payment Cumulative Totals $ Complete <br /> Line Description Last Chna Ord Unit Price Unit Measure <br /> Quantity Amount Quantity Amount Quantity Amount <br /> RIVHRPLAY PLAYGRODND AT 3RINNER BUTTE PARR <br /> General <br /> 0000 LIQUIDATED DAMAGES ($700.00) DAY 0.000 $0.00 0.000 $0.00 0.000 $0.00 0.00 <br /> 0010 MOBILIZATION $65,150.98 LUMPSUM 1.000 <br /> $65,150.98 0.000 $0.00 0.920 $59,938.90 M 92.00 <br /> 0020 TEMP PROTECTN/DIRECTN $5 227 00 LUMPSVM 1 000 $5 227 00 0 000 $0 00 0 500 $2 613 50 50 00 <br /> 0030 EROSION CONTROL $2,414.00 LUMPSUM 1.000 <br /> $2,414.00 0.000 $0.00 0.800 $1,931.20 80.00 <br /> 0040 TREE PRESERVATION FENCING $3.96 LINPT 3,600.000 $14,256.00 0.000 $0.00 3,070.000 $12,157.20 85.00 <br /> 0050 TREE PRUNING $41.80 HOUR 10.000 418.00 0.000 $0.00 0.000 $0.00 0.00 <br /> 0060 CONSULTATION, ARBOAIST $71.50 HOUR 15.000 $1,072.50 0.000 $0.00 0.000 $0.00 0.00 <br /> 0070 ROUGH GRADING $0.35 SQPT 50,000.000 $17,500.00 0.000 $0.00 50,000.000 $17,500.00 100.00 <br /> 0080 5.5" CONCRETE _ $5.07 SQFT 14 700 000 $74 529 00 3 875 000 $19 646 25 11 210 000 $56 834 70 M 76 00 <br /> 0090 5.5" EXPOSED AGGREGATE CONCRET $9.30 SQFT 200.000 $1,860.00 0.000 $0.00 0.000 $0.00 0.00 <br /> 0100 5-1/2" THICK COLORED CONCRETE <br /> $7.91 SQPT 1,500.000 $11,865.00 0.000 $0.00 0.000 <br /> $0.00 0.00 <br /> 0110 CONCRETE 15"-20" THICKENED ED $11.03 LINFT 340.000 3,750.20 0.000 0.00 48.000 $529.44 14.00 <br /> 0120 CONCRETE ACCESS RAMP $560.00 EACH 4.000 $2,240.00 0.000 $0.00 0.000 $0.00 0.00 <br /> 0130 12" WIDE CONCRETE CURB $18.44 LINFT 390.000 $7,191.60 270.300 $4,984.33 270.300 $4,984.33 69.00 <br /> 0140 CONCRETE RAT SLAB FOR POURED S $3.31 S FT 3,580.000 $11,849.80 3,089.000 $10,224.59 3,089.000 $10,224.59 86.00 <br /> 0150 POURED RUBBER SURFACING $16.16 SQPT 3,325.000 <br /> $53,732.00 0.000 $0.00 0.000 $0.00 0.00 <br /> 0160 PLAY AREA ACCESS RAMP $360.00 EACH 3.000 $1,080.00 1.000 $360.00 1.000 $360.00 33.00 <br /> <br /> 0170 6" WIDE CONCRETE CURB $18.47 LZNFT 170 000 $3 139 90 170 500 $3 149 14 170 500 $3 149 14 100 00 <br /> <br />