Page 2 <br /> <br /> Run Date: 02/07/2006 12:59:05 <br /> City of Eugene <br /> Contract Preliminary Progress Payment <br /> Payment No : 009 <br /> Contractor: 2G CONST. Original Contract: $597,322.25 <br /> Job 93-004151 Current Amount: $713,809.19 <br /> Contract No: 2005-00025 Contract Award Date: 05/23/2005 <br /> PO 2005050480 Completion Date: 11/01/2005 <br /> Assessable: No <br /> Current Contract Bstimated Payment Cumulative Totals t Complete <br /> Line Description Last Cling Ord Unit Price Unit Measure Quantity Amount Quantity Amount Quantity Amount <br /> RIVHRPLAY PLAYGROSIND AT BHINNHR BVTTH PARK <br /> General <br /> 0000 LIQUIDATED DAMAGES ($700.00) DAY 0.000 $0.00 0.000 $0.00 0.000 $0.00 0.00 <br /> 0010 MOBILIZATION $65,150.98 LUMPSUM 1.000 $65,150.98 0.000 $0.00 0.920 $59,938.90 92.00 <br /> 0020 TEMP PROTBCTN/DIRBCTN $5,227.00 LUMPSUM 1.000 $5,227.00 0.100 $522.70 0.700 $3,658.90 70.00 <br /> 0030 EROSION CONTROL $2,414.00 LUMPSUM 1.000 $2,414.00 0.000 $0.00 0.800 $1,931.20 80.00 <br /> 0040 TREE PRESERVATION FENCING $3.96 LINPT 3,600.000 $14,256.00 0.000 $0.00 3,070.000 $12,157.20 85.00 <br /> 0050 TREE PRUNING $41.80 HOUR 10.000 $418.00 0.000 $0.00 0.000 $0.00 0.00 <br /> 0060 CONSULTATION, ARBORIST $71.50 HOUR 15.000 $1,072.50 0.000 $0.00 0.000 $0.00 0.00 <br /> 0070 ROUGH GRADING $0.35 SQFT 50,000.000 $17,500.00 0.000 $0.00 50,000.000 $17,500.00 100.00 <br /> 0080 5-5" CONCRETE $5.07 SQFT 14,700.000 $74,529.00 0.000 $0.00 15,775.200 $79,980.26 M 107.00 <br /> 0090 5.5• HZPOSHD AGGRBGATH CDNCAST $9.30 SQFT 300.000 $1,860.00 0.000 50.00 353.000 57,282.90 176.00 <br /> 0100 5-1/2" THICK COLORED CONCRETE $7.91 SQFT 1,500.000 $11,865.00 0.000 $0.00 1,337.750 $10,581.60 89.00 <br /> 0110 CONCRETE 15"-20" THICR6tiBD 6D $1I.03 LINFT 340.000 $3,750.20 0.000 $0.00 253.000 $2,790.59 74.00 <br /> 0120 CONCRETE ACCESS RAMP $560.00 EACH 4.000 $2,240.00 0.000 $0.00 4.000 $2,240.00 100.00 <br /> 0130 12" WIDE CONCRETE CURB $18.44 LINFT 390.000 $7,191.60 0.000 $0.00 288.300 $5,326.25 74.00 <br /> 0140 CONCRETE RAT SLAB FOR POURED S $3.31 SQFT 3,580.000 $11,849.80 145.000 $479.95 3,827.750 $12,669.85 107.00 <br /> OI50 POURED RUBBER SURFACING $16.16 SQFT 3,325.000 $53,732.00 60.500 $977.68 3,522.500 $56,923.60 106.00 <br /> 0160 PLAY AREA ACCESS RAMP $360.00 EACH 3.000 $1,080.00 0.000 $0.00 3.000 $1,080.00 100.00 <br /> 0170 6" WIDE CONCRETE CURB $18.47 LINFT 170.000 $3,139.90 0.000 $0.00 172.250 $3,181.46 101.00 <br /> <br />