<br /> - CALL FOR BIDS
<br /> BID N0.7
<br /> Notice is hereby given that the City Council
<br /> of tthe City of Eugene, Oregon wi0 receive
<br /> sealed bids until Wednesday, April 6, 2005,
<br /> until the Bid Closing time of 2:00 p.m. at the
<br /> office of the City Engineer, 244 East Broad-
<br /> wav Eugene, Oregon. The Bid Opening will
<br /> be at 2:05 p.m., on Wednesday, April 6,
<br /> 20b5, at the above location, at which time
<br /> and place those Bids will be opened and
<br /> re d.
<br /> ~b: 4151 RIVERPLAY PLAYGROUND AT
<br /> S INNER BUTTE PARK at 205 Cheshire
<br /> Avenue. Pro'ect Scope: Concrete demolition
<br /> and remova~, rough grading, 1,130 Lin. Ft.
<br /> drain pipe, drainage structures, 16,400 Sq.
<br /> Ft. concrete paving, 630 Lin. Ft. concrete
<br /> cubs and play area edging, 145 Lin Ft. con-
<br /> crddte retaining walls, concrete steps, 675 Sq.
<br /> Ft.'sand set brick pavers, play equipment m-
<br /> stallation, site furniture installation, 4,000 Sq.
<br /> Ft., poured ribber surfacing, water play
<br /> fe 'ture installation, plumbing, electrical
<br /> wi ng, irriggation and landscape.
<br /> ompletion date for the project is Novem- -
<br /> bet 1, 2005.
<br /> pRE-BID MEETING: All interested parties
<br /> are invited to attend anon-mandatory pre-bid
<br /> meleting to be held on Wednesday, March
<br /> 23 2005, at 1:30 p.m. in the Garden Room,
<br /> 241 E. Broadway, Eugene, Oregon.
<br /> plans and specifications ma be reviewed
<br /> and/or obtained at the office ofythe City Engi-
<br /> n88r, 244 East Broadway, Eugene, Oregon
<br /> 97401, for anon-refundable fee of $35.00
<br /> plus $6.50 postage. For other reviewing loca-
<br /> tions and any question regarding the project
<br /> ~IBase call (541)) 682-5560, or use our Enggi-
<br /> ~ nnq Bid. Website www.ci.eugene.or.us/P
<br /> W7Engineenng/Bids to review Plans and
<br /> Specifications.
<br /> Bids shall be accompanied by a certified
<br /> check, cashier's check or bidder's bond pay-
<br /> able to the City of Eugene in an amount
<br /> egwal to ten percent of the amount bid. Filing
<br /> of 8 qualification questionnaire before bidding
<br /> wilt not be required. Contingent or conditional
<br /> bid$ will not be considered for acceptance.
<br /> No bid will be received or considered unless
<br /> tha bid contains a statement by the bidder
<br /> that provisions of ORS 279.350 pertaining to
<br /> pr ailin wage rates shall be complied with.
<br /> Prime Bidders are required to submit, with
<br /> all 'bid proposal documents prior to the bid
<br /> closing date and time, a list of First-Tier Sub-
<br /> contractors as defined in ORS 279.027. For
<br /> this project, the First-Tier Subcontractor Dis-
<br /> closure Statement must be submitted regard-
<br /> les¢g of the bid amount.
<br /> No bid will be accepted by the City unless it
<br /> co tains a statement by the bidder as a part
<br /> of he bid that the bidder in carryingg out the
<br /> co tract will comply with all applicable laws.
<br /> e City may retest any bid not in compli-
<br /> an with all prescribed public bidding proce-
<br /> dur~s and requirements, and may reject for
<br /> goad cause any or all bids or to waive any
<br /> s cification or requirement upon a finding of
<br /> they City that it is in the public interest to do
<br /> so.
<br /> Gated this 16th day of March, 2005.
<br /> ' MARK SCHOENING, P.E.
<br /> I City Engineer
<br /> Pulblished March 16, 2005. 1009608008-1t