New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4168 LCOG PMT 4
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2008
>
GJN4168 LCOG PMT 4
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/18/2011 11:10:05 AM
Creation date
6/25/2008 3:49:17 PM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Invoices-Payments & Receivables
PW_Active
No
External_View
No
GJN
004168
GL_Project_Number
935076
COE_Contract_Number
2004-05402
Retention_Destruction_Date
9/13/2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> ? y ~O~ <br /> Lane Council of Governments <br /> 99 East Broadway, Suite 400, Eugene, Oregon 97401-3111 (541) 682-4283 Fax: (541) 682-4099 TTY.' (541) 682-4567 <br /> Memorandum <br /> To: Eric Wold, Parks and Open Space Division, Wetlands Program Supervisor <br /> From: Jeff Krueger, Lane Council of Governments <br /> Subject: Wetland and Open Waterways Site Planning Technical Assistance Contract <br /> Date: July 6, 2004 <br /> This memorandum describes services rendered for the Wetland and Open Waterways Site Planning <br /> Technical Assistance Contract (#2004-05402) for the fourth quarter of fiscal year 2004 (April 1, 2004 - <br /> June 30, 2004). The activities are broken down into four primary activity codes: Dragonfly Bend Habitat <br /> Enhancement Project (non-mitigation bank); Dragonfly Bend Mitigation Bank TA; General POS <br /> Assistance; and Mitigation Bank TA. This contract was amended on May 26 to add an additional <br /> $15,000 to the contract (total contract amount $42,500) and to extend the contract end date through <br /> February 1, 2005. <br /> Fourth Quarter Services Provided <br /> Dragonfly Bend Habitat Enhancement Project: <br /> • Revised conceptual concept diagram to reflect design changes (over aerial base) <br /> Dragonfly Bend Mitigation Bank TA: <br /> • Updated Dragonfly Bend Existing Conditions and Action Plan Maps to reflect updated wetland <br /> delineation. <br /> • Updated the Dragonfly Bend MIP narrative to reflect new wetland delineation and minor concept <br /> changes (upland prairie location, berm along road, water control structure). <br /> • Attended a Field Operations Group meeting (May 15). <br /> General POS Assistance <br /> • Met with Scott Duckett regarding a National Park Service application for technical assistance through <br /> the Rivers and Trails Community Assistance Program for a Ridgeline Area Master Plan. <br /> • Rivers and Trails Community Assistance Program grant writing (Christine Puetz). <br /> • Developed a list of property owners within'h mile of the potential National Hertitage Area (NHA) <br /> study boundary and produced associated map. <br /> • Printed an additional 50 copies of the River to Ridges vision document for Eugene POS use. <br /> • Developed a Parks and Open Space for city newsletter (Sarah Finney) <br /> • Printed an additional 10 sets of Stormwater Corridor Management Plans for Eugene POS use. <br /> • Created Butterfly Survey Routes Map. <br /> • Began Wild Iris Ridge Management Planning Procecess: <br /> • Developed an Existing Conditions Map (with 2004 aerial base) for the Wild Iris Ridge Site <br /> • Conducted three site visits to Wild Iris Ridge. <br /> • Researched and recorded Wild Iris Ridge historic and existing conditions. <br /> • Organized and lead a staff planning site visit to Wild Iris Ridge (June 29). <br /> • Developed a draft set of management goals for Wild Iris Ridge. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.