New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4168 BLM Contract
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2008
>
GJN4168 BLM Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/18/2011 11:10:04 AM
Creation date
6/25/2008 3:36:51 PM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Contracts
PW_Active
No
External_View
No
GJN
004168
GL_Project_Number
935076
COE_Contract_Number
2004-05403
Retention_Destruction_Date
9/13/2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
1.4. Fire Precautions <br /> 1.4.1 All state fire laws will be followed. <br /> Specific requirements for fire equipment may vary by local fire district. The <br /> CITY is required to check with local fire districts and furnish any equipment <br /> ~ ' required by tliose districts. ~ - <br /> 2.0 DEFINITIONS <br /> None. <br /> 3.0 COOPERATOR FURNISHED ITEMS <br /> All materials, supplies, and equipment needed to complete this work will be <br /> provided' by the Cooperator. <br /> 4.0 GOVERNMENT-FURNISHED ITEMS <br /> None. <br /> 5.0 SPECIFIC TASKS <br /> The purpose of this task order is to provide funding for in-stream, riparian, <br /> wetland, and upland habitat types along Amazon Creek near Dragonfly Bend. The <br /> <br /> - ~ specific tasks include: <br /> A. Engineering and design. This will be conducted by City staff and consultants <br /> hired by the CITY. This task will include costs such as pre-construction <br /> surveys, as well as production of construction documents and bid <br /> specifications. <br /> B.. Contract and project management, including advertisement, administration, <br /> and bid preparation of <br /> project. This work will be performed by CITY staff. <br /> C. The clearing of existing, mostly non-native, vegetation that is growing along <br /> the creek banks and in the riparian zone. This work will be performed by a <br /> contractor hired by the City using a competitive bid process, or by CITY staff. <br /> .The work will be inspected on-site by City staff. <br /> D. Smoothing the grade of the levee banks along Amazon Creek. This work will <br /> be performed by a contractor hired by the City using a competitive bid <br /> process. The work will be inspected on-site by City staff. <br /> E. Widening the creek channel in several locations. This work will be performed <br /> by a contractor hired by the City using a competitive bid process. This work <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.