~~W~ <br /> Notification of Commencement and Public Works <br /> <br /> Cgmpletion Dates for Contract Projects Engineering <br /> City of Eugene <br /> 244 E. Broadway <br /> Eugene, OR 97401 <br /> (541) 682-5560 <br /> PATE CONTRACT NO. <br /> d9-13-04 2005-009 <br /> PROJECT NAME JOB NO. <br /> bRAGONFLY BEND HABITAT ENHANCEMENT PROJECT 4168 <br /> CONTRACTOR FEDERAL AID PROJECT NO. <br /> KIPCO, INC. N/A <br /> INSPECTOR PHONE NUMBER DATE OF AWARD <br /> ~FAHSBENDER TOM 682-8818 08'12-04 <br /> FIRST NOTIFICATION <br /> 48-12-04 IS THE DATE ON WHICH THE CONTRACT WORK BEGAN. Inspector Signature <br /> SECOND NOTIFICATION <br /> ~PEClFIED COMPLETION DATE (S) (FROM SECT. 00180.50) DAYS CHARGED DATE (S) THE WORK WAS SUBSTANTIALLY <br /> BEYOND SPECIFIED COMPLETED & THE TIME CHARGES STOPPED. <br /> COMPLETION <br /> 19-15.04 0 1.015-04 <br /> ALL CLAIM3 FOR ADDITIONAL COMPENSATION MUST BE SUBMITTED BY: 1030-04 <br /> (SEE SUBSECTION 00199.30 OF THE CONTRACT PROVISIONS FOR ADDITIONAL REQUIREMENTS.) <br /> Inspet~or Signature <br /> THIRD NOTIFICATION <br /> ;Notice of Completion. Begin Warranty Period. <br /> 2-1-05 IS THE DATE ON WHICH ALL CONTRACT WORK WAS COMPLETED, INCLUDING CORRECTIVE WORK, EQUIPMENT AND <br /> PLANT REMOVAL, SITE CLEANUP, AND PROJECT MANAGER'S RECEIPT OF ALL CERTIFICATIONS, BILLS AND OTHER DOCUMENTS <br /> REQUIRED UNDER THE CONTRACT. THIRD NOTIFICATION INITIATES THE START OF THE ONE YEAR WARRANTY PERIOD ON ALL CONTRACT <br /> WORK EXCLUDING ALL PLANT MATERIAL WHICH HAS A TWO YEAR WARRANTY PERIOD. <br /> IN ACCORDANCE WITH SECTION 00170 OF THE STANDARD SPECIFICATIONS AND CITY AMENDMENT #1, ALL WORK IS GUARANTEED BY THE <br /> CONTRACTOR FOR ONE YEAR, EXCLUDING ALL PLANT MATERIAL, FOLLOWING THE DATE OF THE CITY'S NOTICE OF WORK COMPLETION. <br /> IN ACCORDANCE WITH SECTION 01040.79 OF THE SPECIAL SPECIFICATION ALL PLANT MATERIAL IS GUARNTEED BY THE CONTRACTOR <br /> FOR TWO YEARS FOLLOWING THE DATE OF THE CITY'S NOTICE OF WORK COMPLETION. MANUFACTURE WARRANTIES REMAIN IN EFFECT <br /> i FOR THE DURATION OF THE EXPRESSED LENGTH OF THE WARRANTY IF GREATER THAN THE REQUIRED ONE YEAR. THE CONTRACTOR IS <br /> RESPONSIBLE FOR REPAIRS OR REPLACEMENTS MADE NECESSARY BY DEFECTS IN WORK THAT BECOME EVIDENT WITHIN THE ONE- <br /> YEAR WARRANTY PERIOD. REPAIRS OR REPLACEMENTS MADE WITHIN THE ONE-YEAR WARRANTY PERIOD WILL BE RE diRED TO BE <br /> GUARANTEED FOR ONE YEAR FROM DATE OF ACCEPTANCE OF THE REPAIR. K' <br /> For Privately Engineered Projects Only <br /> Engineer: <br /> Address: <br /> Owner: <br /> Address: <br /> DISTRIBUTION: <br /> i<acta~ MalMenance-Planning EngineeringlOwner/Surety Construction Manager <br /> PW Administra o~ PIC Engineering PW E As Constrict Monitor MADD Supervisor <br /> File <br /> Q:\PROJECTS\PROJ-8\4168\Construction\Inspection\Third Notification.doc APRIL 2ooa <br /> <br />