AFFIDAVIT OF PUBLICATION
<br /> P.O. Box 10127 /Portland, Oregon 97296-0127 / (503)226-1311 FAX (503) 222-5358
<br /> STATE OF OREGON, COUNTY OF MULTNOMAH, -ss.
<br /> I, MARC CAPLAN, being first duly sworn, depose and say that I am a Manager of the DAILY JOURNAL OF
<br /> COMMERCE, a newspaper of general circulation in the counties of CLACKAMAS, MULTNOMAH and
<br />
<br /> WASHINGTON as defined by ORS 193.010 and 193.020; published at Portland in the aforesaid County and
<br /> State; that I know from my personal knowledge that the
<br /> CALL FOR BIDS
<br /> DRAGONFLY BEND HABITAT ENHANCEMENT PROJECT
<br /> a printed copy of which is attached, was published in the entire issue of this newspaper for 1 time(s) in the
<br />
<br /> following issues:
<br /> 07/07/2004. CITY OF EUGENE
<br /> DRAGONFLX BEND HABITAT
<br /> ENHANCEMENT PROJECT
<br /> Bids due 2:00 PM, July 22
<br /> CALL FORBIDS
<br /> Notice is herep ID NO.'2f
<br /> cil of the, Clty of Euge eg Oregton wil~eCcef
<br /> e
<br />
<br /> Subscribed and rn to before me this 8th day of July, 2004. sealed bids unt11 Thursday, July 22, zoos,
<br /> until the $id Closing time of 2:00 p.m. at the
<br /> oRice of the City Etigh~er, 244 .East Broad-
<br /> way, Eugene, Oregpri. The Bid Opening will
<br /> be at 2:05 p.m., on Thursday, July 22, 2004,
<br /> at the above locafign, at which time and
<br /> place thosa'Bids wilt be openedand read.
<br /> ~`~T~~ HANCEMEWG
<br /> BNRpJECT.ND HABITAT EN-
<br /> 4t68 located nearGreanhill Road and
<br /> Royal Avenue along the "R" Channel. Exca-
<br /> OFFlCIALSEAL vation and habitat creation with the Riparian
<br /> SCOTT D. CAPLAN zone (1 LS Mobliization; 1 LS Temporary
<br /> NOTARY PUBLIC-OREGON vationCt~Geneira t~Off S to"~~ 9,600 Cub. Yd.
<br /> COMMISSION N0.361262 Excavation,. General ~on site^; 30,000 sq.
<br /> MY COMM6SSION EXPIRES SEPTEMBER 16, 2OG6 Yd. Erosion Fabric(1 LS De-Water; 16,580
<br /> Each Native Plants (Installed); 600 Cub. Yd.
<br /> Mulch; `1 LS Erosion'Control; 235 Ton, Boul-
<br /> der)
<br /> MANDATORY PRE-BID MEETING: All. in-
<br /> terested parties must attend apre-bid meet-
<br /> ing to tie held on Wedneadity, July 14, 2004,
<br /> at 10:00 a:rn. in the Garden aortiference room
<br /> at 244 E. Broadway, Eugene; Oregon.
<br /> All earthwork and`stabilfzatipn work within
<br /> the channel. mpst be completed by Septem-
<br /> ber 30, 2004. All other work except vegeta-
<br /> lion insfallatloh including all clean-up shall be
<br /> completed by October 15; 2004. All vegeta-
<br /> tioninstallation and associated work shall be
<br /> completeGby.March 30, 20p*~,
<br /> - Plans and specifications may be ,reviewed
<br /> and/or obtained at the office of the Cittyy Engi-
<br /> Weer,. 244 Easf Broadway, Eugene, bregon
<br /> 97401', for anon-refundable fee of $0.00
<br /> plus $6:50 postage. For other reviewing loca-
<br /> tions and any question regarding the project
<br /> please call (541) 682.5560, or use our.Engi-
<br /> neerlhg Bid Websitij www.cLeugene,orus
<br /> /PW/Engineering/Bids tq review Plans and
<br /> Specifications.
<br /> Bids shall be accompanied by a certified
<br /> cheek, cashier's check or bidder's bdnd pay
<br /> able to he City of Eugene in ah amount
<br /> CITY OF EUGENE-ENGINEERING equaitotenpercentofthe,amountbid.Filing
<br /> of a qualification questignnaire before bidding
<br /> LYNN BROG D EN will not'be required. Contingent or conditional
<br /> 244 E. BROADWAY bids will not be considered for aoceptance.
<br /> the bid ciontainscalsfa ement by the b rider
<br /> EUGENE, OR 97401 that provisigns of ORS,279.350 Rertaining to
<br /> prevailing wage rates.shall be complied with.
<br /> Rnme Bidders are required fo submit; with
<br /> all bid proposal documents. prior to the bid
<br /> closing date and time, a Hsi of First-Tier Sub-
<br /> contractors as defined In ORS 279.027. For
<br /> this project, the First Tier Subcontractor Dls-
<br /> closure Statement must be submitted.regard~
<br /> less of the bid amount
<br /> No.bid will be accepted by the City unless it
<br /> contains a statement by the bidder as a part
<br /> of the bid-that the bidder in carrying out the
<br /> contract will comply with all eppl(cable laws.
<br /> The City may reject any bid. not in compll-
<br /> dures a~ndarequirementep end mays reject for
<br /> specification or equlgement upon f
<br /> n~ding of. ~ '
<br /> the City that It is in the public interest to do
<br /> so.
<br /> Dated this 7th day of Julyy, 2004,
<br /> MARK SCHOENING, P.E,
<br /> Published July 7, 2004, i0pigg gnCB 1t