New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4180 Oregon Woods Contract
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2008
>
GJN4180 Oregon Woods Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/20/2010 2:34:23 PM
Creation date
6/25/2008 1:45:31 PM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Contracts
PW_Active
No
External_View
No
GJN
004180
GL_Project_Number
945212
Identification_Number
2005100263
COE_Contract_Number
2005-00019
Retention_Destruction_Date
11/17/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
8.3 Workers' Compensation Insurance. All employers, including the Contractor and its <br /> Subcontractors, if any, that employ subject workers who are performing Work or providing <br /> labor or Materials under the Contract in the State of Oregon shall comply with ORS <br /> 656.017 and provide the required Workers' Compensation coverage, unless such <br /> employers are exempt under ORS 656.126. The Contractor shall ensure that each of its <br /> Subcontractors complies with these requirements. Contractor shall provide City with <br /> such further assurances as City may require from time to time that Contractor is in <br /> compliance with these Workers' Compensation coverage requirements and the Workers' <br /> Compensation law. The Contractor shall ensure that its insurance carrier files a guaranty <br /> contract with the Oregon Workers' Compensation Division before pertorming any Work. <br /> 9. Pertormance and Payment Bonds. Prior to the commencement of the Work, Contractor shall <br /> provide good. and sufficient performance and payment bonds approved by City, each in an <br /> amount squat to the 100% of the Contract Sum, for the faithful pertormance of the Work in all <br /> respects and indemnifying City for any claims or liens for labor, work, equipment or material <br /> provided by others in the performance of the Work. The amount of the pertormance and payment <br /> bonds shall be increased whenever the Contract Sum is increased for any reason. <br /> 10. Termination and Suspension. City may terminate this contract or suspend the Work at any time <br /> as provided in the Spec cations: <br /> 11. ,Preference For Goods and Services. <br /> 11.1 Contractor shall use recyclable products to the maximum extent economically feasible in <br /> the pertormance of the contract work set forth in this document. Recycled products <br /> include all materials, goods and supplies, not less than 50 percent of the total weight of <br /> which consists of secondary and post consumer waste with not less than 10 percent of its <br /> total weight consisting of post consumer waste, as well as any product that could have <br /> been disposed of as a solid waste, having completed its life cyGe as a consumer item, but <br /> otherwise refurbished for reuse without substantial alteration of the product's form. <br /> 11.2 In performance of the Work, Contractor shall prefer materials that have been <br /> manufactured or produced in the state of Oregon, if price, fitness, availability and quality <br /> are otherwise equal. <br /> 12. Foreign Contractor. If Contractor is not domiciled in or registered to do business in the state of <br /> Oregon, and the Contract Sum exceeds $10,000, City shall not make final payment to Contractor <br /> until Contractor complies with the requirements of ORS 279.021(2)(a) and provides City with <br /> copies of all forms provided to the Department of Revenue. <br /> 13. Laws and Ordinances. In addition to provisions of the laws of the State of Oregon and the <br /> ordinances of the City of Eugene specifically identified in this contract, Contractor shall comply <br /> with and require its Subcontractors to comply with all applicable provisions of Federal, State and <br /> local statutes, ordinances, orders, rules and regulations. <br /> 14. Default and Wilifui Violation. If the Contractor willfully violates any of the provisions of Sections <br /> <br /> • 4.615 to 4.650 of the Eugene Code, 1971, or any of the provisions of State law governing public • <br /> contracts, or if Contractor knowingly files false affidavits of compliance required under the <br /> Contract, Contractor shall waive for a period of one year any right to bid upon any public <br /> improvement project let by City. If Contractor or any of Contractor's Subcontractors violates any <br /> such provisions or files any such false affidavits of compliance, or in the event Contractor <br /> otherwise fails to perform any of its obligations under this contract, time and quality of <br /> performance being of the essence, City may, at its option, terminate this contract upon written <br /> notice to Contractor. In the event of a termination of this contract or a subcontract under these <br /> provisions, Contractor or the Subcontractor, if applicable, shall forfeit all rights under this contract <br /> or the subcontract, as the case may be. The City's claim for damages under paragraph 15 and <br /> Public Improvement Contrad for Use with Oregon Standard Specificatlons-Page 3 <br /> (Revised February 2004) <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.