Public Works <br /> Engineering <br /> City of Eugene <br /> 244 East Broaclwe~y <br /> Eugene, Oregon 97401 <br /> (541) 682-5560 <br /> (541) 682-8410 Fax <br /> ADDENDUM N0.2 <br /> T4 THE CONTRACT DOCUMENTS AND $PECIpICAT10NS FOR <br /> AMAZON HEADWATERS TRAIL BETWEEN THE END OF CANYON QRIVE AND EXTENDING TQ F,.)gSTING <br /> RIDGELINE TRAILHEAD ON FOX HOLLOW ROAD <br /> SEPTEMBER 22, 2Q44 JOB #4180 BID NUMBER 28 <br /> TO ALL PLANHOI.Dt;RS: <br /> The following changes shall amend and supplement the project bidding documents only to the extent specifically <br /> shown and noted. Ali over conditlons shall remain the same. <br /> Bidders shsn incorporate the effects of these changes fn the appropriate bid items induded in this addendum <br /> and the total of these bid items then add in the appropriate place an the bid form. <br /> CHANGtzS TO BID CLOS~IO DATE: <br /> 1' ItOM: Wednesday, September 22, 2001. • 2:00 p.m. <br /> TO: Tuesday, September Z8, 2004 - 2:00 p.m. <br /> If you have questions about this addendum or the project, please call Adam Steffen at (641)682-6040_ <br /> Ali bidders shalt acknowledge the receipt of and acceptance of this Addendum No. 2 by signing and submitting <br /> the signed Addendum with the bid. Bids sut~mitted without Phis Addendum, or with the Addendum not signed, will <br /> considered i~nfo~al, <br /> rk Sc~oening, P.E. <br /> City Engineer <br /> Receipt acknowledged and conditions agreed <br /> ~K <br /> this ~ day of 4~?~ , 2004. <br /> <br /> Addendum #2 -Job #4180 <br /> <br />