- - . _ _ ~ ~ wuuic r n cnu l¢J 003/011 <br /> letterhead and signed by an authorized company representative, stating that the firm meets the <br /> minimum quafificatkuts stated above and certifying the accuracy and validity of the supporting <br /> documentation, The documentation shall demonstrate that, to the Project Manager's satisfaction, the <br /> Bidder meets the minimum qualifications and shall include, at a minimum: <br /> • The name and current contact information of eli companies and/ or agencies for whom the <br /> bidder pertormed slmNar work during the required mfiimum experience period and the names <br /> and reference numbers of the projects, <br /> • the name and current contact information for at least two companies and/ or agencies for <br /> whom the bidder performed prevailing wage work during the required minimum experience <br /> . period and names and reference numbers of the projects, <br /> • a description of the projects undertaken during the required experience period, and the work <br /> types/items involved, <br /> g brief description of the general goats, timelines. site conditions, and chaNenging issues for <br /> each of the projects undertaken during the required experience period, <br /> Bids submitted without the accompanying qualification documentation, those that fail to meet the <br /> minimum qualfications, or those that are accompanied by Incomplete or unverifiable documentation. <br /> may be rejected as non-responsive. <br /> Any sub-contractor proposed for the bridges and puncheons shall meet the above qualiticatian criteria <br /> for their portion of the work. The Bidder shall sut?mit similar sub-contractor qualification documentation <br /> for the sub-oontractors portion of the proposed work with the other bid documents prior to the t3id <br /> Closing. <br /> (ADD) 001.x0.70 Bld Booklet <br /> Add " Section 602 -Minor Concrete Structures" (attached) to the list of specification sections under <br /> Forest Servke "Standard Soecif(cations far Construction of Goads and Bridges" (included in contract). <br /> This section appi(es to concrete work assodated to the concrete bridge sills. <br /> Add •SPS t302.03 ~ 9/16/04" (attached) to the list of specification sections under Fon3st Service <br /> "Spatial Project Spsciflcations" (included in contract). <br /> (ADD) 00120.20 Intarpratatlott of Quantities In Bld SchQduls <br /> The following Line Numbers listed In the Bid Schedule ors associated to the following Pay Items in the <br /> Work Summaries: <br /> Line No. item Psv item <br /> 0010 Mobilization 951(01) <br /> 0020 Temp. Protectnl Dlrectn ' <br /> 0030 Erosion Control <br /> 0040 Clearing b Grubbing 911(02) <br /> 0050 F~ccavation 912(01) <br /> 0060 Grade Dip 912(12) <br /> 0070 Switchback. Type 1 914(01) <br /> 0080 Log Barrier on Posts 914(05) <br /> 0090 Half Round Culverts 921(01)a <br /> 0100 Solid Round (Double) Culverts 921(01 <br /> 0110 Puncheon w/ Decking (Sta. 2+20 to 2+26.4) 932(02)e <br /> 0120 Puncheon w/ Decking (Sta. 4+b8 to 4+86.1) 932(02)b <br /> 0130 Log Retaining Wali 934(01) <br /> 0140 Agg. Surface -Grading B, Compaction Method (a) 941(02) <br /> <br /> Addendum #1 -Job #4180 <br /> <br />