Trails Eng. <br /> Invoice <br /> 540 Amazon Headwaters Administration <br /> 1) Set footing elevation and confirmed alignment with the contractor 4 20 <br /> ~concemin the brid a from sta. 2+35.5 to 2+40.4. I was there while _ <br /> he excavated and set the footing on the west side of the creek. I also <br /> walked down to sta. 9+40 where the excavator was workin towards <br /> _ _ _ _ the lower bridgesite and discussed the disposal area which is located _ _ _ _ <br /> between sta. 9+10 to 9+23. Wamed him no sidecast between 8+80 <br /> to 9+10. I also marked two trees to be cut below station 9+40 (7/25/05) <br /> _ 2 Walked down to lower brid esite, set alinement and elevation for 3 20 _ _ Includes writin u dia <br /> the bdd~e with contractors worker Contractor has the footings and <br /> beams laced in the holders on upper bridge site. The de th of <br /> a r ate was not figured into celcuatl~the proper elevation of _ <br /> _ _ the material to be excavated for the footing yesterday. This makes <br /> _ <br /> the brid a 6" lower than what it should be. The~rede on the east <br /> _ side of the bride <br /> will be graded down to fd the bridge elevation. The _ <br /> contractor and I made the calcuation mistake, neither of us cau ht _ <br /> the error esterda (7/26/05. _ _ <br /> 3 Walked down to the lower brid esite. Contractor has footin and _ 2 _ 20 <br /> beams installed. Walked with Ci and Contractor discussin what is <br /> e ed in finished trail such as disposal, trail widths and so on 7/28. _ _ _ _ <br /> 4 Walked down to lower brid esite. Contractor has almost com /elect 2.5 0 Incudes writin u dia <br /> brid a with onl the decking to space and Wait down. Bridge looks _ <br /> _ ood. The contractor and hel r were workin on the switchback <br /> I barrier wired from sta. 8+45 to 8+50 (8/01/05). _ <br /> _ SLMet with the contractor and city and walked from station 0+00 to _ 2.5 _ 20 <br /> 8+90 discussing what is expected as the finished product. It was <br /> discussed that the water. dips are too shallow. The trail widths looked <br /> about right. Remaining work mostly consists of overhead brushing _ <br /> _ <br /> stump trimming and root removal (8/04/05 <br /> B) Walked upper portion of item 1 from lower bridge to top and looked 2.5 20 <br /> at items needing finished before acceptance with city. Aiso wa_Ik_ed <br /> - <br /> from brid a down to <br /> powerline and marked waterbars and discussed <br /> the contract modification concemin ditchin and tum ike with <br /> contractor (8/09105). <br /> - - <br /> 7) Walked full length of project with city and helped make <br /> _ u a unchlist_for the contractor to use to finalize the pro'ect (8/15/05). 3.5 20 <br /> <br /> j - <br /> ubtotal 20 120 <br /> Page 1 <br /> <br />