New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4172 CO1
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2008
>
GJN4172 CO1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/20/2010 2:31:36 PM
Creation date
6/25/2008 11:49:01 AM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Contracts
PW_Active
No
External_View
No
GJN
004172
GL_Project_Number
955064
Identification_Number
2005100486
COE_Contract_Number
2005-00030
Retention_Destruction_Date
10/13/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CITY OF EUGENE <br /> DEPARTMENT OF PUBLIC WORKS <br /> ENGINEERING DIVISION <br /> Change Order Job # ant <br /> Contract # 2005-30 <br /> :ONTRACTOR: 2-G Construction Change Order # 1 <br /> (ADDRESS) 1719 Irving Road Date: 07118!05 <br /> P.O. BOX 11735 CAMS Date: <br /> Eugene, OR 97440 <br /> Reviewed by: Date: <br /> PROJECT: West University Neighborhood Alleys Inspector. Shawn S aht <br /> Constr. M r. Pai a Dickinson <br /> Proj. Mgr. Steve Gallu _ <br /> Principal Eng. Paul Klo e ` <br /> <br /> You ire directed to make the following changes in this contract: <br /> <br /> Contract <br /> Item <br /> No. <br /> 232 le 1 ~ 2 Raise concrete forms on south side of ells #1 innin at station 2+58 to 4" hi her than desi n at station 2+77 maintainin raised <br /> ielevation to station 3+20 and transition down m desi n rode at staton 3+26. Ad ust base rods to new rades. See Memo #4. <br /> 622 ` 1 8 & 22 Con~ruct a standard cleanout on existln 8" concrete sewer I .See Memo #2. <br /> 624 'Ile 8 & 22, Construct concrete ram at concrete dumster ad. See Memo #5. <br /> 782 Alle 10, Standb for conflicts with utilities and ad'ustments to redes. <br /> s Changes the bid items as follows: <br /> Cont~'act Contract <br /> Item' Time Quantity Unit Amended Net <br /> No. Item Change (Units) Cost Amount Change Change <br /> 232 Alley 1 & 2, Alley grade adjustment 0 Ori final 0.00 , 0.00 0.00 $0.00 <br /> Revised 0.001 0.00 0.00 <br /> Amended 1.00 $588.96 $588.96 $588.% <br /> 622 Alley 8 & 22, Construct 8" deanout 2 Ori final O.OD 0.00 0.00 $0.00 <br /> Revised O.OD 1 0.00 .00 <br /> Amended 1.00 ~ $8 126.65 $8 126.65 $8 126.65 <br /> 624 'Alley 8 & 2Z, Construct concrete ramp 0 Ori final O.OD 0.00 .00 $0.00 <br /> Revised 0.00 0.00 .00 <br /> Amended 1.00 $449.11 $449.11 9.11 <br /> 782 Alley 10, Standby for utility conflicts 0 Ori Ina! 0.00 0.00 0.00 $0.00 <br /> Revised 0.001 0.00 0.00 <br /> Amended 1.00 $305.05 $305.05 $305.05 <br /> Ori final 0.00 0.00 0.00 $0.00 <br /> Revised 0.00 i 0.00 .00 <br /> Amended 0.00 $0.00 $0.00 $0.00 <br /> Ori anal 0.00 0.00 .00 $0.00 <br /> Revised 0.00 0.00 0.00 <br /> Amended O.OD $0.00 $0.00 $0.00 <br /> The Original contract work days are o.o da <br /> The Contract time change this C.O 2.o da <br /> The ¢ontract time change by previous C.O.'s 0.0 da <br /> The drew contract work da are 2.o da <br /> e Original contract Sum was $439,927.43 <br /> Net Change by previous change order SO.Op <br /> Net Change due to amendment by previous change order SO,DO <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br />. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> The Contract sum prior to this change order was <br /> $439.927.43 <br /> This change order will change contract sum by this amount <br /> 59,469.77 <br /> The new contract net change sum 50.00 <br /> The new contract amendment sum Ss,469.n <br /> The new contract sum including this change order will be <br /> $449,397.20 <br /> Percents a of on final contract 2.15% <br /> NET HANG OUE AMENDME <br /> Approval by: <br /> gL~!.l.L <br /> City nglneer Prime Contractor Third Party <br /> low <br /> Date Date Date <br /> CONTRACTOR ~ OFFICE FILE ~ PURCHASING/CRO <br /> O\FORMS\PROJECT\CONSTIREVISED CHANGE ORDER.XLS <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.