New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4172 2G PMT 1
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2008
>
GJN4172 2G PMT 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/20/2010 2:31:35 PM
Creation date
6/25/2008 11:46:57 AM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Invoices-Payments & Receivables
PW_Active
No
External_View
No
GJN
004172
GL_Project_Number
955064
Identification_Number
2005100486
COE_Contract_Number
2005-00030
Retention_Destruction_Date
10/13/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> Run Date: 07/05/2005 15:15:50 Page 4 <br /> city of Eugene <br /> Contract Preliminary Progress Payment <br /> Payment No 001 <br /> Contractor: 2G CONST. Original Contract: $439,927.43 <br /> Job 93-004172 Current Amount: $439,927.43 <br /> Contract No: 2005-00030 Contract Award Date: 05/27/2005 <br /> PO 2005050486 Completion Date: 10/07/2005 <br /> Assessable: Yes <br /> Current Contract Estimated Payment Cumulative Totals B Complete <br /> <br /> Line Description Last Chng Ord Unit Price Uait Measure Quantity Amount Quantity Amount Quantity Amount <br /> 0350 3/4 INCH-0 AGGREGATE BASE SURF $3-71 SQFT 89.000 $330.19 0.000 $0.00 0.000 $0.00 0.00 <br /> 0360 1 1/2"-0 AGGREGATE SASS $19.21 CUYD 141.000 $2 708.61 0.000 $0.00 0.000 $0.00 0.00 <br /> 0370 LEVEL 2, 1/2 INCH DSNSS HMAC $2.28 SQPT 1,534.000 $3,497.52 0.000 $0.00 0.000 $0.00 0.00 <br /> 0380 PLAIN CONC PVMNT, UNDOWELLED, $5.49 SQFT 6,555.000 $35,986.95 0.000 $0.00 0.000 ~ $0.00 0.00 <br /> 0390 CONCRETE PUMPING $0 13 SQPT 6 555.000 $852.15 0.000 $0.00 0.000 $0.00 0.00 <br /> 0400 TOPSOIL $4.29 SQFT 162.000 $694.98 0.000 $0.00 0.000 $0.00 0.00 <br /> 0410 SAW CUTTING $1.65 LINFT 730.000 $1,204.50 0.000 $0.00 0.000 $0.00 0.00 <br /> Alleys 8 4 22 ' <br /> )420 MOBILIZATION $4 086 52 LUMPSUM 1.000 $4,086.52 1.000 $4,086.52 1.000 $4,086.52 100.00 <br /> )430 TEMP PROTECTN/DTRSCTN $8,386.00 LUMPSUM 1.000 $8,386.00 1,000 $8,386.00 1.000 $8,386.00 100.00 <br /> )440 TREE PROTECTION FENCING $5.17 L]1QFT 30.000 $155.10 103,000 $532.51 103.000 5532.51 343.00 <br /> )450 EROSION CONTROL $303.00 LUMPSUM 1.000 $303.00 1.000 $303.00 1.000 $303.00 100.00 <br /> )460 10" DRAIN PIPE $32.11 LINE'T 25.000 $802.75 25.000 $802.75 25.000 ~ $802.75 100.00 <br /> )470 CATCH BASINS $825.00 EACH 2.000 $1,650.00 2.000 $1,650.00 2.000 $1,650.00 100.00 <br /> )480 CURB INLETS TYPE 4A $964 00 EACH 1 000 $964.00 0.000 $0.00 0.000 _ $0.00 0.00 <br /> )490 GENERAL ERCAVATION $20.57 CUYD 135.000 $2,776.95 158.000 $3,250.06 158.000 $3,250.06 117.00 <br /> )500 SUBGRADE STABILIZATION $11.44 CUYD 71.000 $812.24 33.000 $377.52 33.000 $377.52 46.00 <br /> )510 SUHCRADS GEOTEXTILE $1 03 SQYD 428.000 $440.84 147.000 $151.41 _ 147.000 $151.41 34.00 <br /> )520 3/4 INCH-0 AGGREGATE BASS SURF $0.70 SQFT 164.000 $114.80 0.000 $0.00 0.000 $0.00 0.00 <br /> )530 LEVEL 2, 1/2 INCH DENSE HMAC $6.94 SQFT 163.000 $1,131.22 0.000 $0.00 0.000 $0.00 0.00 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.