New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4172 2G PMT 1
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2008
>
GJN4172 2G PMT 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/20/2010 2:31:35 PM
Creation date
6/25/2008 11:46:57 AM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Invoices-Payments & Receivables
PW_Active
No
External_View
No
GJN
004172
GL_Project_Number
955064
Identification_Number
2005100486
COE_Contract_Number
2005-00030
Retention_Destruction_Date
10/13/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
1 <br /> Run Date: 07/05/2005 15:15:50 1 <br /> City of Eugene Page 7 <br /> Contract Preliminary progress Payment <br /> Payment No 001 <br /> Contractor: 2G CONST. <br /> Job 93-004172 Original Contract: $439,927.43 <br /> Contract No: 2005-00030 Current Amouat: <br /> PO 2005050486 Contract Award Date: 05/27/2005439,927'43 <br /> Assessable: yea Completion Date: 10/07/2005 <br /> Liae Deacrintion Last Chn Ord Current contract <br /> Unit Price Unit Measure Estimated Payment <br /> Quantity Amount Quantity C1m:ulative Totals 8 Complete <br /> Amount QuaatitY Amouat <br /> 0920 PLAIN CONC PVMNT, UNDOWELLED, <br /> $5.58 SQPT 4,955.000 $27,648.90 0.000 <br /> 0930 4 INCH CONC WALK $0.00 0.000 $0.00 <br /> $4.21 S PT 0.00 <br /> 36.000 $151.56 0.000 <br /> 0940 CONCRETfi PUMPING 0.00 0.000 $0.00 <br /> $0.17 SQFT 4,955.000 0.00 <br /> 0950 TOPSOIL $842.35 0.000 <br /> $4.29 SQFT 273.000 $1,171.17 $0.00 0.000 $0.00 0.00 <br /> 0960 SAW CUTTING 0.000 <br /> $2.20 LINFT S0.00 0.000 $0.00 0.00 <br /> 0970 54.000 <br /> TIE BARS $118.80 60.000 $132.00 60.000 111.00 <br /> $6.99 EACH 28.000 $132.00 <br /> Alley 17 $181.72 0.000 $0.00 0.000 $0.00 <br /> 0.00 <br /> 0980 MOBILIZATION <br /> $5,711.25 LUMPSUM 1.000 $5,711.25 0.000 <br /> 0990 TEMP PROTECTN/DIRECTN $0.00 0.000 $0.00 <br /> $7,836.00 LUMPSUM 0.00 <br /> 1000 1.000 $7,836.00 0.000 <br /> EROSION CONTROL 0.00 0.000 $0.00 <br /> $303.00 LUMPSUM 0.00 <br /> 1010 1.000 $303.00 0.000 <br /> TRfiE PROTECTION FENCING $0.00 0.000 $0.00 0.00 <br /> $5.17 LINFT 260.000 <br /> 1020 TREE, REMOVAL $1,344.20 0.000 $0.00 0.000 <br /> $207.00 EACH $0.00 0.00 <br /> 1030 3.000 $621.00 0.000 <br /> 10" DRAIN PIPE $0.00 0.000 $0.00 0.00 <br /> $31.68 LINPT 68.000 <br /> 1040 CATCH BASINS $2,154.24 0.000 $0.00 <br /> $0.00 0.000 0.00 <br /> $1,087.00 EACH 4.000 $4,348.00 0.000 <br /> 1050 CONNECTION TO EXISTING PIPES ( $0.00 0.000 $0.00 <br /> $666.00 EACH 0.00 <br /> 1060 1.000 $666.00 0.000 <br /> GENERAL EXCAVATION $0.00 0.000 $0.00 0.00 <br /> $20.70 CUYD 180.000 $3,726.00 0.000 <br /> 1070 SUBGRADS STABILIZATION ~ $0.00 0.000 $0.00 <br /> $13.86 CUYD 0.00 <br /> 1080 32.000 $443.52 0.000 <br /> SUBGRADE GEOTEXTILE $0.00 0.000 $0.00 0.00 <br /> $1.03 S YD 541.000 $557.23 0.000 <br /> 1090 3/9 INCH-0 AGGREGATE BASE SURP $0.00 0.000 0.00 <br /> $0.59 SQFT 1,759.000 0.00 <br /> <br /> 1100 1 1/2"-0 AGGREGATE BASE $1,037.81 0.000 $0.00 0.000 <br /> $19.61 CUYD $0.00 0.00 <br /> 105.000 $2,059.05 0.000 <br /> $0.00 0.000 $0.00 0.00 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.