Run Date: 08/10/2005 15:18:51 <br /> Page 10 <br /> City of Eugene <br /> Contract Preliminary Progress Paymeat <br /> Payment No 002 <br /> Contractor: 2G CONST. Original Contract: $439,927.43 <br /> Job 93-004172 Current Amount: $449,397.20 <br /> Contract No: 2005-00030 Contract Award Date: 05/27/2005 <br /> PO 2005050486 Completion Date: 10/07/2005 <br /> Assessable: Yea <br /> Current Contract Estimated Payment Cumulative Totals 6 Complete <br /> Line Description Last Cling Ord Unit Price Uait Measure Quantity Amount Quantity Amount Quantity Amount <br /> 1430 CONNECTION TO EXISTING STRUCTU $179.00 EACH 1.000 $179.00 0.000 $0.00 0.000 $0.00 0.00 <br /> 1440 GENERAL EXCAVATION $20.78 CUYD 80.000 $1,662.40 0.000 $0.00 0.000 $0.00 0.00 <br /> 1450 SUBGRADE STABILIZATION $13.86 CUYD 47.000 $651.42 0.000 $0.00 0.000 $0.00 0.00 <br /> 1460 SUBGRADE GEOTSXTILE 1.03 S YD 294.000 292.52 0.000 0.00 0.000 $0.00 0.00 <br /> 1470 3/4 INCH-0 AGGREGATE BASE SURF $1.80 SQFT 61.000 $109:80 0.000 $0.00 0.000 $0.00 0.00 <br /> 1480 LSVSL 2, 1/2 INCH DSNSS HMAC $6.31 SQFT 323.000 $2,038.13 0.000 $0.00 0.000 $0.00 0.00 <br /> 1490 PLAIN CONC PVMNT UNDOWELLED $5.50 S PT 2 549.000 $14,019.50 0.000 0.00 0.000 $0.00 0.00 <br /> 1500 CONCRETE PUMPING $0.21 SQFT 2,642.000 $554.82 0.000 $0.00 0.000 $0.00 0.00 <br /> 1510 1 1/2"-0 AGGREGATE BASE $18.04 CUYD 63.000 $1,136.52 0.000 $0.00 0.000 $0.00 0.00 <br /> 1520 5 INCH CONC SURFACING $4.56 SQFT 93.000 $424.08 0.000 0.00 0.000 $0.00 0.00 <br /> 1530 TOPSOIL <br /> $4.29 SQFT 36.000 $154.44 0.000 <br /> $0.00 0.000 $0.00 0.00 <br /> 1540 TIE BARS $6.49 EACH 32.000 $207.68 0.000 $0.00 0.000 $0.00 0.00 <br /> <br /> 1550 SAW CUTTING $1.93 LINFT 294.000 $567.42 0.000 $0.00 0.000 $0.00 0.00 <br /> $499,397.20 $217,008.77 $293,158.26 <br /> <br />