New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4172 2G PMT 3
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2008
>
GJN4172 2G PMT 3
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/20/2010 2:31:35 PM
Creation date
6/25/2008 11:45:38 AM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Invoices-Payments & Receivables
PW_Active
No
External_View
No
GJN
004172
GL_Project_Number
955064
Identification_Number
2005100486
COE_Contract_Number
2005-00030
Retention_Destruction_Date
10/13/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• 1 <br /> Run Date: 09/09/2003 11:03:13 <br /> Page 9 <br /> City of Eugene <br /> ' Contract Preliminary Progress Payment <br /> Payment No : 003 <br /> Contractor: 2G CONST. Original Contract: $439,927.43 <br /> Job 93-004172 Current Amount: $467,090.08 <br /> COnt ract No: 2006-00030 Contract Award Date: 06/27/2005 <br /> PO 2005050486 Completion Date: 10/07/2005 <br /> Assessable: Yea <br /> Current Contract Estimated Payment Cumulative Totals 6 Complete <br /> Line Description Last Chng Ord Unit Price UAit Measure Quantity Amount antit Amount antit Amount <br /> 0310 CATCH BASINS $1,138.00 EACH 3.000 <br /> $3,414.00 0.600 $682.80 3.000 $3,414.00 100.00 <br /> 0320 OHNERAL EBCAVATION $20.11 CUYD <br /> 204.000 $4,102.44 227.000 $4,664.97 324.000 <br /> $6,516.64 159.00 <br /> 0330 SUBGRADE STABILIZATION $13.86 CVYD 46.000 $623.70 0.000 $0.00 0.000 $0.00 0.00 <br /> 0332 SUBGRADE EXTRA STABILZATION-AL 002 $1,284.62 LUMPSUM 1.000 $1,284.62 1.000 $1,284.62 1.000 $1,284.62 100.00 <br /> 0334 EXTRA EXCAVATION-ALLfiY 6 003 $614.62 LUMPSUM 1.000 $614.62 1.000 $614.62 1.000 $614.62 100.00 <br /> 0340 SUBGRADE GEOTfiXTLLE $1.03 SQYD 728.000 <br /> $749.84 427.000 $439.81 583.000 $600.49 80.00 <br /> 0350 3/4 INCH-0 AGGREGATE BASE SURF <br /> $3.71 SQFT 89.000 $330.19 66.000 <br /> 0360 1 1/2"-0 AGGREGATE BASE $244.86 66.000 $244.86 74.00 <br /> $19.21 CVYD 141 000 $2 708 61 ss 000 <br /> $1 056 55 100 000 $1 921 00 71 00 <br /> 0370 LEVEL 2, 1/2 INCH DENSE HNAC $2.28 34FT 1,534.000 S3,497.s2 2,233.000 $5,091.24 2,233.000 $s, 091.24 146.00 <br /> 0380 PLAIN CONC PVMNT, UNDOWEI,LED, $5.49 SQFT 6,555.000 $35,986.96 6,265.000 $34,394.85 6,266.000 $34,394.85 96.00 <br /> 0390 CONCRETE PUMPING $0.13 S FT 6,555.000 <br /> $852.16 0.000 $0.00 0.000 $0.00 0.00 <br /> 0400 TOPSOIL $4.29 SQBT 162.000 $694.98 271.000 <br /> 1 162.69 2 <br /> $ 71.000 $1,162.59 167.00 <br /> 0410 SAW CUTTING $1.66 LINFT 730.000 <br /> $1,204.60 336.000 $652.76 725.000 $1,196.25 99.00 <br /> <br /> Alleys 8 & 22 <br /> 0420- MOBILIZATION 4 086.52 LUMPSUM 1.000 $4,086.52 0.000 0.00 1.000 $4,086.52 100.00 <br /> 0430 TEMP PROTECTN/DIRECTN $8,386.00 LUMPSUM 1.000 <br /> $8,386.00 0.000 $0.00 1.000 $8,386.00 100.00 <br /> 0440 TREE PROTECTION FENCING <br /> $6.17 LINPT 30.000 $155.10 0.000 <br /> $0.00 103.000 $632.51 343.00 <br /> 0450 EROSION CONTROL $303.00 LUMPSUM 1.000 303.00 0.000 0.00 1.000 $303.00 100.00 <br /> 0460 10" DRAIN PIPE $32.11 LINFT 26.000 <br /> $802.76 0.000 $0.00 26.000 $802.75 100.00 <br /> 0470 CATCH BASINS $826.00 EACH 2.000 <br /> $1,6so.oo o.ooo $o.oo z.ooo $l,sso.oo loo.oo <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.