Run Date: OR/09/2005 11:03:13 <br /> City of Eugene Page 7 <br /> Contract Preliminary Progress Payment <br /> Payment No s 003 <br /> Contractor: 2G CONST. <br /> Job 93-004172 Original Contract: $439,927.43 <br /> Contract No: 2005-00030 Current Amount: $457,090.08 <br /> PO 2005050486 Contract Award Date: 05/27/2005 <br /> Assessable: Yee Completion Date: 10/07/2005 <br /> Line Description Current Contract Hetimated Payment Cumulative Totals i Complete <br /> Laat Chnq Ord Unit Price Unit Measure Quantity Amount antit <br /> Amount ant it Amount <br /> 0800 TEMP PROTECTN/DIRECTN $7 836.00 LUMPSUM 1.000 $7,836.00 0.000 <br /> $0.00 1.000 $7,836.00 100.00 <br /> 0810 EROSION CONTROL $303.00 LUMPSUM 1.000 $303.00 0.000 <br /> $0.00 1.000 $303.00 100.00 <br /> 0820 TREE PROTECTION FENCING $5.17 LINFT 80.000 $413.60 83.000 <br /> $429.11 83.000 $429.11 104.00 <br /> 0830 10" DRAIN PIPE $35.01 LINFT 50.000 1,750.50 0.000 <br /> $0.00 50.400 1 764.50 101.00 <br /> 0840 CATCH BASINS $1,285.00 EACH 3.000 $3,855.00 0.000 <br /> $0.00 3.000 $3,855.00 100.00 <br /> 0850 CONNECTLON TO fiXISTING PIPES ( $607.00 EACH 1.000 $607.00 0.000 <br /> $0.00 1.000 $607.00 100.00 <br /> 0860 GENERAL EXCAVATION $21.10 CUYD 162.000 $3 418.20 0.000 <br /> $0.00 164.500 $3 470.95 102.00 <br /> 0870 SUBGRADE STABILIZATION $13.86 CUYD 32.000 $443.52 0.000 <br /> $0.00 6.000 $83.16 19.00 <br /> 0880 SUBGRADE GEOTEXTILE $1.03 SQYD 550.000 $566.50 0.000 <br /> $0.00 39.400 $40.58 7.00 <br /> 0890 3 4 INCH-0 AGGREGATE BASE SURF 0.63 S FT 731.000 460.53 0.000 <br /> 0.00 894.000 563.22 122.00 <br /> 0900 1 1/2"-0 AGGREGATE RASE $19.58 CUYD 107.000 $2,095.06 0.000 <br /> $0.00 6.000 $117.48 6.00 <br /> 0910 LHVHL 2, 1/2 INCH DHNBH Bt4AC $6.62 3QFT 231.000 $1,529.22 0.000 <br /> $0.00 561.000 $3,713.62 243.00 <br /> 0920 PLAIN CONC PVMNT, UNDOWELLED $5.58 S FT 4,955.000 $27,648.90 0.000 <br /> $0.00 4 908.000 27,386.64 99.00 <br /> 0930 4 INCH CONC WALK $4.21 SQFT 36.000 $151.56 0.000 <br /> $0.00 32.000 $134.72 89.00 <br /> 0940 CONCRETE PUMPING $0.17 SQFT 4,955.000 $842.35 0.000 <br /> $0.00 0.000 $0.00 0.00 <br /> 0950 TOPSOIL $4.29 S FT 273.000 1,171.17 0.000 <br /> 0.00 125.000 $536.25 46.00 <br /> 0960 8AW CUTTING $2.20 LINPT 54.000 $118.80 0.000 <br /> $0.00 228.000 $501.60 422.00 <br /> 0970 TIH BARS $6.49 HACH <br /> 18.000 $181.72 0.000 $0.00 60.000 <br /> <br /> Alley 17 $389.40 214.00 <br /> 0980 MOBILIZATION $5,711.25 LUMPSUM 1.000 $5 711.25 0.000 <br /> 0.00 1.000 $5 711.25 100.00 <br /> <br />