. l <br /> Run Date: 09/09/2005 11:03:13 <br /> City of Eugene Page 10 <br /> Contract Preliminary Progress Payment <br /> Payment No x 003 <br /> Contractor: 2G CONST. <br /> Job 93-004172 Original Contract: $439,927.43 <br /> Contract No: 2006-00030 Current Amount: $457,090.08 <br /> PO 2005060486 Contract Award Date: OS/27/200s <br /> Assessable: Yes ~ Completion Date: 10/07/2006 <br /> Line Descri lion Current Contract Estimated Payment Cumulative Totals i Complete <br /> P Last Chng Ord Unit Price Unit Measure Quantity Amount antit Amount Quant it <br /> Y Amount <br /> 1360 TEMP PROTECTN/DIRECTN $7,836.00 LUMPSUM 1.000 $7,836.00 0.400 <br /> 3,134.40 0.400 $3,134.40 40.00 <br /> 1370 TREE PROTHCTION FENCING $6.17 LINFT 30.000 $156.10 0.000 <br /> $0.00 0.000 $0.00 0.00 <br /> 1380 EROSION CONTROL $303.00 LUMPSUM 1.000 $303.00 0.400 <br /> $121.20 0.400 $121.20 90.00 <br /> 1390 10" DRAIN PIPE $28.83 LINFT 102.000 2,940.66 82.000 <br /> $2,364.06 82.000 $2 364.06 80.00 <br /> 1400 ADJUST CLEANOUT $162.00 HACH 1.000 $152.00 0.000 <br /> $0.00 0.000 $0.00 0.00 <br /> 1410 MINOR ADJUSTMENT OF MANHOLES $297.00 EACH 1.000 $297.00 0.000 <br /> 1420 CATCH BASINS $0.00 0.000 $0.00 0.00 <br /> $1 022.00 EACH 1.000 1 022.00 0.800 817.60 0.800 <br /> $817.60 80.00 <br /> 1430 CONNHCTION TO EXISTING STRUCTU $179.00 HACH 1.000 $179.00 1.000 <br /> $179.00 1.000 $179.00 100.00 <br /> 1440 GfiNERAL EXCAVATION $20.78 CUYD 80.000 $1,662.40 0.000 <br /> $0.00 0.000 $0.00 0.00 <br /> 1450 SUBGRADH STABILIZATION $13.86 CUYD 47.000 661.42 0.000 <br /> $0.00 0.000 $0.00 0.00 <br /> 1460 SUBGRADH GEOTEXTILH $1.03 SQYD 284.000 $292.62 0.000 <br /> $0.00 0.000 $0.00 0.00 <br /> 1470 3/4 INCH-0 AGGREGATE BASE SURF $1.80 SQFT 61.000 $109.80 0.000 <br /> $0.00 0.000 $0.00 0.00 <br /> 1480 LEVEL 2, 1 2 INCH DfiNSfi HMAC 6.31 S FT 323.000 $2 038.13 0.000 <br /> $0.00 0.000 0.00 0.00 <br /> 1490 PLAIN CONC PVMNT, UNDOWELLED, $S.sO SQFT 2,549.000 $14,019.50 0.000 <br /> $0.00 0.000 $0.00 0.00 <br /> 1500 CONCRHTE PUMPING $0.21 SQFT 2,642.000 $664.82 0.000 <br /> $o.oo o.ooo $o.oo o.oa <br /> 1510 1 1 2"-0 AGGREGATH HASH $18.04 CUYD 63.000 1,136.62 0.000 <br /> $0.00 0.000 $0.00 0.00 <br /> <br /> 1620 5 INCH CONC SURFACING $4.66 SQPT 93.000 $424.08 0.000 <br /> $0.00 0.000 $0.00 0.00 <br /> <br /> 1530 TOPSOIL $4.29 SQFT 36.000 $154.44 0.000 <br /> $0.00 0.000 $0.00 0.00 <br /> <br /> 1540 TIE BARS $6.49 EACH 32.000 207.68 0.000 <br /> $0.00 0.000 $0.00 0.00 <br /> <br /> 1550 SAW CNTTING $1.93 LINFT 294.000 $667.42 14.000 <br /> $z7.oz 14.000 $27.02 s.oo <br /> <br />