. 1 <br /> <br /> Run Date: 10/11/2005 16:07:47 Page 7 <br /> City of Eugene <br /> Contract Preliminary Progress Payment <br /> Payment No 004 <br /> Contractor: 2G CONST. Original Contract: $439,927.43 <br /> Job 93-004172 Current Amount: $457,090.08 <br /> Contract No: 2005-00030 Contract Award Date: 05/27/2005 <br /> PO 2005050486 Completion Date: 10/07/2005 <br /> Assessable: Yes <br /> Current Contract Estimated Payment Cumulative Totals i Complete <br /> Line Description Last Chng Ord Unit Price Uait Measure Quantity Amount Quantity Amount Quantity Amount <br /> 0800 TEMP PROTECTN/DIRECTN ~ $7,836.00 LUMPSUM 1.000 $7,836.00 0.000 $0.00 1.000 $7,836.00 100.00 <br /> 0810 EROSION CONTROL $303.00 LUMPSUM 1.000 $303.00 0.000 $0.00 1.000 $303.00 100.00 <br /> 0820 TREH PROTECTION FENCING $5.17 LINFT 80.000 $413.60 0.000 $0.00 83.000 $429.11 104.00 <br /> 0830 10" DRAIN PZPB $35.01 LINPT 50.000 $1,750.50 0.000 $0.00 50.400 $1,764.50 101.00 <br /> 0840 CATCH BASINS $1,285.00 EACH 3.000 $3,855.00 0.000 $0.00 3.000 $3,855.00 100.00 <br /> 0850 CONNECTION TO EXISTING PIPES ( $607.00 EACH 1.000 $607.00 0.000 $0.00 1.000 $607.00 100.00 <br /> 0860 GENERAL EXCAVATION $21.10 CUYD 162.000 $3,418.20 0.000 $0.00 164.500 $3,470.95 102.00 <br /> 0870 SUBGRADE STABILIZATION $13.86 CUYD 32.000 $443.52 0.000 $0.00 6.000 $83.16 19.00 <br /> 0880 SVBGRADE GEOTHXTILE $1.03 SQYD 550.000 $566.50 0.000 $0.00 39.400 $40.58 7.00 <br /> 0890 3/4 INCH-0 AGGREGATE HASE SURF $0.63 SQPT 731.000 $460.53 0.000 $0.00 894.000 $563.22 122.00 <br /> 0900 1 1/2"-0 AGGREGATE BASE $19.58 CUYD 107.000 $2,095.06 0.000 $0.00 6.000 $117.48 6.00 <br /> 0910 LEVEL 2, 1/2 INCH DEN3E }3MAC $6.62 SQPT 231.000 $1,529.22 0.000 $0.00 561.000 $3,713.82 243.00 <br /> 0920 PLAIN CONC PVMNT, UNDOWELLED, $5.58 SQFT 4,955.000 $27,648.90 0.000 $0.00 4,908.000 $27,386.64 99.00 <br /> 0930 4 INCH CONC WALK $4.21 SQFT 36.000 $151.56 0.000 $0.00 32.000 $134.72 89.00 <br /> 0940 CONCRETE PUMPING $0.17 SQFT 4,955.000 $842.35 0.000 $0.00 0.000 $0.00 0.00 <br /> 0950 TOPSOIL $4 29 SQFT 273 000 $1 171.17 0.000 $0.00 125.000 $536.25 46.00 <br /> 0960 3AN LOTTING 52.20 LZNFT 54.000 $118.80 0.000 $0.00 228.000 $501.60 422.00 <br /> 0970 TIB HAR9 56.49 BACB 28.000 $181.72 0.000 $0.00 60.000 S389.40 214.00 <br /> Alley 17 <br /> 0980 MOBILIZATION $5,711.25 LUMPSUM 1.000 $5,711.25 0.000 $0.00 1.000 $5,711.25 100.00 <br /> <br />