New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4172 2G PMT 5-Final
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2008
>
GJN4172 2G PMT 5-Final
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/20/2010 2:31:35 PM
Creation date
6/25/2008 11:44:23 AM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Invoices-Payments & Receivables
PW_Active
No
External_View
No
GJN
004172
GL_Project_Number
955064
Identification_Number
2005100486
COE_Contract_Number
2005-00030
Retention_Destruction_Date
10/13/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
r <br /> <br /> Rua Date: 11/08/2005 09:53:36 Page 4 <br /> City of Bugeae <br /> Contract Preliminary Progress Payment <br /> Payment No 005 Final fay <br /> Contractor: 2G CONST. Original Contract: $439,927.43 <br /> Job 93-004172 Current Amount: $460,042.90 <br /> Contract No: 2005-00030 Contract Award Date: 05/27/2005 <br /> PO p: 2005050486 Completion Date: 10/07/2005 <br /> Assessable: Yes <br /> Current Contract Batimated~Payment Cumulative Totals i Complete <br /> Line Description Last Chng Ord Unit Price Unit Measure Quantity Amount Quantity Amount Quantity Amount <br /> 0310 GTCH BASINS $1,138.00 BACH 3.000 $3,414.00 0.000 $0.00 3.000 $3,414.00 100.00 <br /> 0320 GffiiSRAI. BZGVATION $20.11 CDYD 204.000 $4,102.44 0.000 $0.00 324.000 $6,515.64 159.00 <br /> 0330 SUBGRADB STABILIZATION $13.86 CUYD 45.000 $623.70 0.000 $0.00 0.000 $0.00 0.00 <br /> 0332 SUBGRADB BXTRA STABILZATION-AL 002 $1,284.62 LUMPSUM 1.000 $1,284.62 0.000 $0.00 1.000 $1,284.62 100.00 <br /> 0334 ®CTRA BXCAVATION ALLBY 6 003 $614 62 LUMPSUM 1 000 $614 62 0 000 $0.00 1.000 $614.62 100.00 <br /> 0340 SUBGRADB GBOTSXTILB $1.03 SQYD 728.000 $749.84 0.000 $0.00 583.000 $600.49 80.00 <br /> 0350 3/4 INCH-0 AGGRHGATE BASS SURF $3.71 SQFT 89.000 $330.19 0.000 $0.00 66.000 $244.86 74.00 <br /> 0360 1 1 2•-0 AGGRBGATB BASB 19.21 CUYD 141.000 $2,708.61 0.000 $0.00 100.000 $1,921.00 71.00 <br /> 0370 LSVSL 2, 1/2 IIiCH DBNSB HIfUC $2.28 SQFT 1,534.000 $3,497.52 0.000 S0.00 2,233.000 $5,091.24 146.00 <br /> 0380 PLAIN CONC PVl87T, UNDOWSLLBD, $5.49 SQPT 6,555.000 $35,986.95 0.000 $0.00 6,265.000 $34,394.85 96.00 <br /> 0390 CONCRBTB PUMPING 0.13 PT 6 555.000 $852.15 0.000 $0.00 0.000 $0.00 0.00 <br /> 0400 TOPSOIL $4.29 BQHT 162.000 $694.98 0.000 S0.00 271.000 $1,162.59 167.00 <br /> 0410 SAW CUTTING $1.65 LINFT 730.000 $1,204.50 0.000 $0.00 725.000 $1,196.25 99.00 <br /> Alleys 8 4 21 <br /> 0420 MOBILIZATION $4 086 52 LUMPSUM 1 000 $4 086.52 0.000 $0.00 1.000_ $4,086.52 100.00 <br /> 0430 TBMP PROTSCTN/DIRSCTN $8,386.00 LVMPSUM 1.000 $8,386.00 0.000 $0.00 1.000 $8,386.00 100.00 <br /> 0440 TRSB PROTBCTZON PBNCINO $5.17 LINPT 30.000 $155.10 0.000 $0.00 103.000 $532.51 343.00 <br /> 0450 EROSION CONTROL $303 00 LUMPSUM 1 000 $303 00 0 000 $0 00 1.000 $303.00 _ 100.00 <br /> 0460 10• DRAIN PIPB $32.11 LINFT 25.000 $802.75 0.000 $0.00 25.000 $802.75 100.00 <br /> 0470 CATCH HASINS $825.00 EACH 2.000 $1,650.00 0.000 $0.00 2.000 $1,650.00 100.00 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.