~ , <br /> Exhibit A <br /> t ~o~~~~~ <br /> CITY OF EUGENE <br /> WEST UNIVERSITY NEIGHBORHOOD <br /> ALLEYS: #1 ~ #2, #8, #8 & 22, #10, #18, <br /> #17, #25 AND #31 <br /> " Blds due 2:00 pm, Apfll S ~ ~f <br /> CALL FOR BIDS lip' <br /> BID NO.B r <br /> Ngtice is hereby given that the City Council <br /> of the City of Eugene, Oregon will receive ~ <br /> sealed bids until Tuesday, April 5, 2005, until <br /> the Bid Closing time of 2:00 p.m. at the office <br /> of the City Engineer, 244 East Broadway, <br /> Eugene, Oregon. The Bid Opening will be at <br /> 2:05 p.m., on Tuesday, April 5, 2005 at the ~.v~ <br /> above locatan, at which Gme and place <br /> those Bids will be opened and read. <br /> Job: 4172 WEST UNIVERSITY NEIGH- <br /> BORHOOD ALLEYS: #1 & #2, #6, #8 & 22, <br /> #10, #16, #17, #25 AND #31 at 8 various lo- <br /> cations in the West University Neighborhood <br /> that are not improved to Ciry surfaang stand- <br /> ards in the area generally bounded by Wil- <br /> lamette Street, 19th Avenue, Kincaid Street, <br /> and Franklin Boulevard (Lump Sum Erosion <br /> Control; 298 Lin. Ft. 10" brain Pipe; 15 Each <br /> Catch Basins; 1,187 Cu. Yd. General Exca- <br /> vation; 4,016 Sq. Yd. Subbpprade Geotextile; <br /> 5,025 Sq. Ft. Level 2, 1/2" Dense HMAC; <br /> 33,591 Sq. Ft. Plain Conc. PVMNT, Undow- <br /> elled, 7" Thick; 36,476 S Ft. Cggoncrete <br /> Basep+205 Sq. Ft 4" Concr~te Walk~r3g142 <br /> Lin.. Ft. Sawcutting; 1,691 Sq. Ft. Topsoil) <br /> In addition to other phased completion <br /> dates identified in the Contract Special Spec- <br /> ifications, all work shall be completed by <br /> September 16, 2005. <br /> Plans and specifications ma be reviewed <br /> and/or obtained at the office of the City Engi- <br /> neer, 244 East Broadway, Eugene, Oregon <br /> 97401, for anon-refundable fee of $15.00 <br /> lus $5.50 postage. For other reviewing loca- <br /> <br /> ~nons and any question regarding the project <br /> please call (541) 682-5560, or use our Engi- <br /> neering Bid Website www.ci.eugene.or.us/ <br /> PW/Engineering/Bids to review Plans and <br /> Specifications. <br /> Bids shall be accompanied by a certified <br /> check, cashiers check or bidder's bond pay- <br /> able to the City of Eugene in an amount <br /> equal to ten percent of the amount bid. Filing <br /> of a qualification questionnaire before bidding <br /> will not be required. Contingent of conditional <br /> bids will not be considered for acceptance. <br /> Nd bid will be received or considered unless <br /> the bid contains a statement by the bidder <br /> that provisions of ORS 279.350 pertaining to <br /> prevailing wage rates shall be complied with. <br /> Pnme Bidders are required to submit, with <br /> all bid proposal documents prior to the bid <br /> closing date and time, a list of First-Tier Sulr <br /> contractors as defined in ORS 279.027. For <br /> this project, the First-Tier Subcontractor Dis- <br /> closure Statement must be submitted regard- <br /> less of the bid amount. <br /> No bid will be accepted by the City unless it <br /> contains a statement by the bidder as a pan. <br /> of the bid that the bidder in carryingg out the <br /> contract will comply with all applicable laws. <br /> The City may re/ect any bid not in compli- <br /> ance with all prescribed public bidding proce- <br /> dures and requirements, and may reject for <br /> good cause any or all bids or to waive any <br /> specification or regwrement upon a finding of <br /> the City that it is in the public interest to do <br /> so. <br /> Dated this 15th day of March, 2005. <br /> MARK SCHOENING, P.E. <br /> Cityy Engineer <br /> Published March 15, 2005. 10096058CB-1t <br /> <br />