Exhibit A <br /> l.% <br /> . o~~oa~~ <br /> CITY OF EUGENE <br /> WEST UNIVERSITY NEIGHBORHOOD <br /> ALLEYS: #S, $ #18, #13, #19, #20, #21, <br /> #23, #29 and #32 <br /> _ Blds due 2:00 pm, March 31 <br /> CALL FOR BIDS <br /> BID NO. S <br /> Notice is hereby given that the City Council <br /> of the City of Eugene, Oregon will receive <br /> <br /> _ sealed bids until Thursday, March 31, 2005, <br /> until the Bid Closing time of 2:00 p.m. at the <br /> office of the City Engineer, 244 East Broad- <br /> way, Eugene, regon. The B+d Opening will <br /> be at 2:05 p.m., on Thursday, March 31, <br /> 2005, at the above location, at which time <br /> and place those Bids will be opened and <br /> read: <br /> Job: 4310 WEST UNIVERSITY NEIGH- <br /> BORHOOD ALLEYS: #5 $ #18, #13, #19, <br /> #20, #21, #23, #29 and #32 at 8 various lo- <br /> cations in the West University Neighborhood <br /> that are not improved to City surfacing stand- <br /> ards in the area generelly bounded by Wil- <br /> lamette Street, 19th Avenue, Kincaid Street, <br /> and Franklin Boulevard (Lump Sum Erosion <br /> Control; 548 Lin. Ft. 10" Drain Pipe; 21 Each <br /> Catch Basins; 996 Cu. Yd. General Excava- <br /> tion; 2974 Sq. Yd. Subgrade Geotextile; <br /> 1616 Sqq. Ft. Level 2, 1/2 "Dense HMAC; <br /> 26,726 Sq. Ft. Plain Conc. gPVMNT, Undow- <br /> Pumpingg" 586 Cu? Yd.81 S1/2" <br /> Ot Agg agate <br /> Base; 22 Sq. Ft. 4 Concrete Walk; 1,991 <br /> Lin. Ft. Sawcutting; 308 Sq. Ft. Topsoil) <br /> In addition to other phased completion <br /> dates identified in the Contract Special Spec- <br /> ifications, all work shall be completed by <br /> September 16, 2005 <br /> Plans and specifications may be reviewed <br /> and/or obtained at the office of the City Engi- <br /> neer, 244 East Broadway, Eugene, Oregon <br /> X7401, for anon-refundable fee of $15.00 <br /> 'us $5.50 postage. For other reviewing loca- <br /> s and any Guest+on regarding the project <br /> ?lease call (541) 682-5560, or use our Engi- <br /> neering Bid Website www.ci.eugene.or.us/ <br /> PW/Engineering/Bids to review Plans and <br /> Specifications. <br /> bids shall be accompanied by a certified <br /> dheck, cashier's check or bidder's bond pay- <br /> able to the City of Eugene in an amount <br /> equal to ten percent of the amount bid. Filing <br /> of a qualification questionnaire before bidding <br /> will not be required. Contingent or conditional <br /> bids will not be considered for acceptance. <br /> NO bid will be received or considered unless <br /> the bid contains a statement by the bidder <br /> that provisions of ORS 279.350 pertaining to <br /> prevailing wage rates shall be complied with. <br /> Pnme Bidders are required to submit, wdh <br /> all bid proposal documents prior to the bid <br /> closing date and time, a list of First-Tier Sub- <br /> contractors as defined in ORS 279.027. For <br /> this project, the First-Tier Subcontractor Dis- <br /> closure Statement must be submitted regard- <br /> less of the bid amount. <br /> No bid will be ac~~ptad by the City unless it <br /> contains a statement by the bidder as a part <br /> of the bid that the bidder in carryingg out the <br /> contract will comply with all applicable laws. <br /> The City may re/act any b+d not in compli- <br /> ance with all prescribed public bidding proce- <br /> dures and requirements, and may reject for <br /> good, cause any or all bids or to wave any <br /> speaficahon or requirement upon a finding of <br /> the City that it is m the public interest to do <br /> so. <br /> Dated this 15th day of March, 2005. <br /> MARK SCHOENING, P.E. <br /> Cityy Engg~ineer <br /> Published March 15, 2005. 10096049CB-1t <br /> <br />