Exhibit A
<br /> l.%
<br /> . o~~oa~~
<br /> CITY OF EUGENE
<br /> WEST UNIVERSITY NEIGHBORHOOD
<br /> ALLEYS: #S, $ #18, #13, #19, #20, #21,
<br /> #23, #29 and #32
<br /> _ Blds due 2:00 pm, March 31
<br /> CALL FOR BIDS
<br /> BID NO. S
<br /> Notice is hereby given that the City Council
<br /> of the City of Eugene, Oregon will receive
<br />
<br /> _ sealed bids until Thursday, March 31, 2005,
<br /> until the Bid Closing time of 2:00 p.m. at the
<br /> office of the City Engineer, 244 East Broad-
<br /> way, Eugene, regon. The B+d Opening will
<br /> be at 2:05 p.m., on Thursday, March 31,
<br /> 2005, at the above location, at which time
<br /> and place those Bids will be opened and
<br /> read:
<br /> Job: 4310 WEST UNIVERSITY NEIGH-
<br /> BORHOOD ALLEYS: #5 $ #18, #13, #19,
<br /> #20, #21, #23, #29 and #32 at 8 various lo-
<br /> cations in the West University Neighborhood
<br /> that are not improved to City surfacing stand-
<br /> ards in the area generelly bounded by Wil-
<br /> lamette Street, 19th Avenue, Kincaid Street,
<br /> and Franklin Boulevard (Lump Sum Erosion
<br /> Control; 548 Lin. Ft. 10" Drain Pipe; 21 Each
<br /> Catch Basins; 996 Cu. Yd. General Excava-
<br /> tion; 2974 Sq. Yd. Subgrade Geotextile;
<br /> 1616 Sqq. Ft. Level 2, 1/2 "Dense HMAC;
<br /> 26,726 Sq. Ft. Plain Conc. gPVMNT, Undow-
<br /> Pumpingg" 586 Cu? Yd.81 S1/2"
<br /> Ot Agg agate
<br /> Base; 22 Sq. Ft. 4 Concrete Walk; 1,991
<br /> Lin. Ft. Sawcutting; 308 Sq. Ft. Topsoil)
<br /> In addition to other phased completion
<br /> dates identified in the Contract Special Spec-
<br /> ifications, all work shall be completed by
<br /> September 16, 2005
<br /> Plans and specifications may be reviewed
<br /> and/or obtained at the office of the City Engi-
<br /> neer, 244 East Broadway, Eugene, Oregon
<br /> X7401, for anon-refundable fee of $15.00
<br /> 'us $5.50 postage. For other reviewing loca-
<br /> s and any Guest+on regarding the project
<br /> ?lease call (541) 682-5560, or use our Engi-
<br /> neering Bid Website www.ci.eugene.or.us/
<br /> PW/Engineering/Bids to review Plans and
<br /> Specifications.
<br /> bids shall be accompanied by a certified
<br /> dheck, cashier's check or bidder's bond pay-
<br /> able to the City of Eugene in an amount
<br /> equal to ten percent of the amount bid. Filing
<br /> of a qualification questionnaire before bidding
<br /> will not be required. Contingent or conditional
<br /> bids will not be considered for acceptance.
<br /> NO bid will be received or considered unless
<br /> the bid contains a statement by the bidder
<br /> that provisions of ORS 279.350 pertaining to
<br /> prevailing wage rates shall be complied with.
<br /> Pnme Bidders are required to submit, wdh
<br /> all bid proposal documents prior to the bid
<br /> closing date and time, a list of First-Tier Sub-
<br /> contractors as defined in ORS 279.027. For
<br /> this project, the First-Tier Subcontractor Dis-
<br /> closure Statement must be submitted regard-
<br /> less of the bid amount.
<br /> No bid will be ac~~ptad by the City unless it
<br /> contains a statement by the bidder as a part
<br /> of the bid that the bidder in carryingg out the
<br /> contract will comply with all applicable laws.
<br /> The City may re/act any b+d not in compli-
<br /> ance with all prescribed public bidding proce-
<br /> dures and requirements, and may reject for
<br /> good, cause any or all bids or to wave any
<br /> speaficahon or requirement upon a finding of
<br /> the City that it is m the public interest to do
<br /> so.
<br /> Dated this 15th day of March, 2005.
<br /> MARK SCHOENING, P.E.
<br /> Cityy Engg~ineer
<br /> Published March 15, 2005. 10096049CB-1t