<br /> CITY OF EUGENE
<br /> WEST UNIVERSITY NEIGHBORHOOD
<br /> ALLEYS: #4, #9, #14, #24, #28, #27, and
<br /> #30
<br /> Bids due 2:00 pm, March 29
<br /> CALL FOR BIDS
<br /> BID NO.4
<br /> Notice is hereby given that the City Council
<br /> of the City of Eugene, Oregon will receive
<br /> sealed bids until Tuesday, March 29, 2005,
<br /> unts the Bid Closing time of 2:00 p.m. at the
<br /> office of the Clty Engineer, 244 East Broad-
<br /> way, Eugene, Oregon. The Bid Opening will
<br /> be at 2:05 p.m., on Tuesday, March 29,
<br /> 2005, at the above location, at which time
<br /> and place those Bids will be opened and
<br /> reatl:
<br /> Job: 4309 WEST UNIVERSITY NEIGH-
<br /> BORHOOD ALLEYS: #4, #9, #14, #24, #26,
<br /> #27, and #30 at 7 various locations in the
<br /> West University Neighborhood that are not
<br /> improved to City surfacing standards in the
<br /> area generally bounded by Willamette Street,
<br /> 19th Avenue, Kincaid Street, and Franklin
<br /> Boulevard ((Lump Sum, Erosion Control• 298
<br /> Lin, Ft. 10" Drain Pipe; 13 Each G~atch
<br /> Basins; 855 Cu. Yd. General Excavation;
<br /> 2,249 Sq. Yd. Sub~rede Geotextile; 1,394
<br /> Sq. FL Level 2, 1/2 Dense HMAC; 24,988
<br /> Thit:kt281285 Sq. Ft. Concrete Pumping 4F2
<br /> Cu; Yd. 1 1/2"-0 Aggregate Base; 65 Sq `
<br /> 4" oncrete Walk; 1,804 Lin. Ft. Sawcutting;
<br /> 82~Sq. Ft. Topsoil) ,
<br /> Ir1 addition to other phased completion
<br /> dates identified in the Contract Special Spec- 1
<br /> ifications all work shall be completed by Oc-
<br /> tober 7, X005
<br /> Plans and specifications may be reviewed
<br /> and/or obtained at the office of the City Engi-
<br /> rr#er, 244 East Broadway, Eugene, Oregon
<br /> "7401, for anon-refundable fee of $15.00
<br /> pus $5.50 postage. For other reviewing loca-
<br /> oAS and any question regarding the project
<br /> please call (541) 682-5560, or use our Engi-
<br /> ne8nng Bid Website www.ci.eugene.or.us/
<br /> PW/Engineering/Bids to review Plans and
<br /> Specifications.
<br /> Elids shall be accompanied by a certified
<br /> check, cashier's check or bidder's bond pay-
<br /> able to the City of Eugene in an amount
<br /> egwal to ten percent of the amount bid. Filing
<br /> of 8 qualification questionnaire before bidding
<br /> will not be required. Contingent or conditional
<br /> bide will not be considered for acceptance.
<br /> Na bid will be received or considered unless
<br /> the bid contains a statement by the, bidder
<br /> that provisions of ORS 279.350 pertaining to
<br /> prevailing wage rates shall be complied with.
<br /> Prime Bidders are required to submit, with
<br /> all bid proposal documents prior to the bid
<br /> closing date and time, a list of First-Tier Sub-
<br /> contrectors as defined in ORS 279.027. For
<br /> this project, the First-Tier Subcontractor Dis-
<br /> closure Statement must be submitted regard-
<br /> less of the bid amount.
<br /> Wo bid will be acrept~d by the City unless it
<br /> contains a statement by the bidder as a part
<br /> of the bid that the bidder in carryingg out the
<br /> contract will comply with all applicable laws.
<br /> The City may re/act any bid not in compli-
<br /> ance with all prescribed public bidding proce-
<br /> dufes and requirements, and may reject for
<br /> gopd cause any or all bids or to waive any
<br /> speafcation or requirement upon a finding of
<br /> thQ City that it is in the public interest to do
<br /> so.
<br /> dated this 15th dayy of March, 2005.
<br /> MARK SCHOENING,. P.E.
<br /> Cityy Engg~ineer
<br /> Published March 15, 2005. 10096048CB-1t