Exhibit A ~}/~J/~Z <br /> ` ~w <br /> ~vo`~ l~ ~ <br /> CITY OF EUGENE <br /> WEST UNIVERSITY NEIGHBORHOOD <br /> ALLEYS: #4, #9, #14, #24, #28, #27, and <br /> #30 <br /> Bids due 2:00 pm, March 29 <br /> CALL FOR BIDS <br /> BID NO.4 <br /> Notice is hereby given that the City Council <br /> of the City of Eugene, Oregon will receive <br /> sealed bids until Tuesday, March 29, 2005, <br /> unts the Bid Closing time of 2:00 p.m. at the <br /> office of the Clty Engineer, 244 East Broad- <br /> way, Eugene, Oregon. The Bid Opening will <br /> be at 2:05 p.m., on Tuesday, March 29, <br /> 2005, at the above location, at which time <br /> and place those Bids will be opened and <br /> reatl: <br /> Job: 4309 WEST UNIVERSITY NEIGH- <br /> BORHOOD ALLEYS: #4, #9, #14, #24, #26, <br /> #27, and #30 at 7 various locations in the <br /> West University Neighborhood that are not <br /> improved to City surfacing standards in the <br /> area generally bounded by Willamette Street, <br /> 19th Avenue, Kincaid Street, and Franklin <br /> Boulevard ((Lump Sum, Erosion Control• 298 <br /> Lin, Ft. 10" Drain Pipe; 13 Each G~atch <br /> Basins; 855 Cu. Yd. General Excavation; <br /> 2,249 Sq. Yd. Sub~rede Geotextile; 1,394 <br /> Sq. FL Level 2, 1/2 Dense HMAC; 24,988 <br /> Thit:kt281285 Sq. Ft. Concrete Pumping 4F2 <br /> Cu; Yd. 1 1/2"-0 Aggregate Base; 65 Sq ` <br /> 4" oncrete Walk; 1,804 Lin. Ft. Sawcutting; <br /> 82~Sq. Ft. Topsoil) , <br /> Ir1 addition to other phased completion <br /> dates identified in the Contract Special Spec- 1 <br /> ifications all work shall be completed by Oc- <br /> tober 7, X005 <br /> Plans and specifications may be reviewed <br /> and/or obtained at the office of the City Engi- <br /> rr#er, 244 East Broadway, Eugene, Oregon <br /> "7401, for anon-refundable fee of $15.00 <br /> pus $5.50 postage. For other reviewing loca- <br /> oAS and any question regarding the project <br /> please call (541) 682-5560, or use our Engi- <br /> ne8nng Bid Website www.ci.eugene.or.us/ <br /> PW/Engineering/Bids to review Plans and <br /> Specifications. <br /> Elids shall be accompanied by a certified <br /> check, cashier's check or bidder's bond pay- <br /> able to the City of Eugene in an amount <br /> egwal to ten percent of the amount bid. Filing <br /> of 8 qualification questionnaire before bidding <br /> will not be required. Contingent or conditional <br /> bide will not be considered for acceptance. <br /> Na bid will be received or considered unless <br /> the bid contains a statement by the, bidder <br /> that provisions of ORS 279.350 pertaining to <br /> prevailing wage rates shall be complied with. <br /> Prime Bidders are required to submit, with <br /> all bid proposal documents prior to the bid <br /> closing date and time, a list of First-Tier Sub- <br /> contrectors as defined in ORS 279.027. For <br /> this project, the First-Tier Subcontractor Dis- <br /> closure Statement must be submitted regard- <br /> less of the bid amount. <br /> Wo bid will be acrept~d by the City unless it <br /> contains a statement by the bidder as a part <br /> of the bid that the bidder in carryingg out the <br /> contract will comply with all applicable laws. <br /> The City may re/act any bid not in compli- <br /> ance with all prescribed public bidding proce- <br /> dufes and requirements, and may reject for <br /> gopd cause any or all bids or to waive any <br /> speafcation or requirement upon a finding of <br /> thQ City that it is in the public interest to do <br /> so. <br /> dated this 15th dayy of March, 2005. <br /> MARK SCHOENING,. P.E. <br /> Cityy Engg~ineer <br /> Published March 15, 2005. 10096048CB-1t <br /> <br /> j~ 1t <br /> <br />