<br /> • ~ <br /> Page 2 of 4 <br /> AIRPORT Eu ene Air ort -Parallel DATE 7/16/07 <br /> Runwa Pro ect , <br /> LOCATION Eugene, Oregon AIP PROJECT NO. 3-41-0018-36 <br /> Job No. 4183 <br /> CONTRACTOR Wildish Construction Co. Chan a Order 18 <br /> JUSTIFICATION FOR CHANGE <br /> 1. Brief description of the proposed contract change(s) and location(s) <br /> 3320 - Access control upgrades needed to stop communication alarms: <br /> Additional work was needed at each gate to isolate the fiber wmmunication equipment from the power supply, gate controllers <br /> and the panel grounding system. <br /> ~ i <br /> 2 <br /> <br />