New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4183 CO18
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2008
>
GJN4183 CO18
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/16/2008 4:51:21 PM
Creation date
6/25/2008 10:53:35 AM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Contracts
PW_Active
Yes
External_View
No
GJN
004183
GL_Project_Number
945202
Identification_Number
2004100581
COE_Contract_Number
2004-00024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
' <br /> rl <br /> CONTRACT CHANGE ORDER NO. 17 <br /> <br /> ~ AIRPORT Eu ene Air ort -Parallel DATE October 12 2006 <br /> Runwa Pro'ect <br /> LOCATION Eugene, Oregon AIP PROJECT NO. .3-41-0018-35 <br /> Job No. 4183 <br /> CONTRACTOR Wildish Construction Change Order 17 <br /> Co. <br /> Item Unit Price Project Sponsor Funded <br /> No. Descri tlon Unit Qt . Amount Amount <br /> 3170 Upgrade Loop detectors at three LS $2,052.60 1 $2,052.60 $0 <br /> ates er Wildish COR 131 <br /> 3180 Extend Fuel Island pad per Wildish LS $1,932.69 1 $0 $1,932.69 <br /> COR 140 <br /> 3190 Replace under canopy lights on LS $1,114.56 1 $0 $1,114.56 <br /> vault buildin er Wildish COR 147' <br /> 3200 New inlet and pipe at Delta and LS $6,210.44 1 $6,210.44 $0 <br /> Papa 300 feet south of Papa per <br /> Wildish COR 102 <br /> 3210 Revise Sign Faces per FAA LS $4,623.59 1 $4,623.59 $0 <br /> certification ins action. <br /> 3220 Re-lamp in-pavement fixture at LS $231.00 1 $0 $213 ~ <br /> RWY 16R/34L and TWY A5 <br /> 3230 Provide communications relay in LS $9,815.83 1 $9,815.83 $0 <br /> two ATS's to provide interface <br /> between ALCS and ATS's <br /> 3240 Provide additional power feed to LS $775.18 1 $775.18 $0 <br /> RVR Control Cabinet in new vault <br /> buildin Wildish COR 201 <br /> ~r 3250 Revise meter enclosure to LS $4,475.27 1 $0 $4,475.27 <br /> Stainless Steel near airport main <br /> entrance for beacon service. <br /> 3260 Install new catch basin and pipe LS $8,061.00 1 $8,061.00 $0 <br /> connection near the intersection of <br /> TWY Papa and Charlie per Wildish <br /> COR 200. <br /> 3270 Install new catch basin and piping LS $46,117.00 1 $46,117.00 $0 <br /> south east of new RWY 16U34R <br /> er Wildish COR 201 <br /> 3280 Change RRE controllers at new LS $7,059.53 1 $7,059.53 $0 <br /> gate access control panels from <br /> dual RRE units to two single RRE <br /> units per Wildish COR 203 <br /> 3290 Raise access control gates and LS $4,765.98 1 $4,765.98 $0 <br /> provide speed bump per Wildish <br /> COR 205 <br /> 3300 Repair pavement at the LS $29,600.00 1 $0 $29,600.00 <br /> intersection of TWY Kilo and Mike <br /> to correct drainage problems Per <br /> Wildish COR 199 <br /> 3310 Extra work due to punchlist LS $1,829.83 1 $1,829.83 $0 <br /> changes is scope per Wildish E- <br /> mait dated 9/21/06 <br /> 3320 Access control Extra Work per LS $3,203.55 1 $0 $3,203.55 <br /> Wildish COR 210 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.