<br /> 09/19J2005 15:56 FAX 541 682 6030 CITY EUGENE Pw ENG f~003/004 <br /> Page 3 ~f 4 i <br /> AIRPORT Ep ens Air ort -Parallel DA'Z'E 4/28/05 <br /> Ritnwa Pro'ect <br /> LOCATION Eugene, Oregon AIP PROJECT NO. 3~1-0018-33/34 r <br /> Job No. 4183 <br /> CONTRACTOR Wildish Constructio>i Co. Chan a Order 10 <br /> JCJSTIFICATION FOR CHANGE <br /> 2.. Rea6on(s) for the change(s) (Contlnue on re.~erse if necessary) <br /> 2180 -Add Wueh end bells to coaduk <br /> End bells create a smoother transition tv prevent excessive bending of the eablc as it is pulled into the vaults. <br /> 2190 - Fanctioaal Improvernenta to the Electrical Building <br /> End bells create a strjoodrer transition to prevem excessive bending of the cable as it is pulled into the vaults <br /> 2200 -Change outalde light at the Electrical Vanlt <br /> The existing light has a flat surface which can provide a space for birds to nest, resulting im the raved for regular cleanup. The <br /> proposed light has an elliptical top that deters birds from nesting on it. <br /> 2210 -Change outside light at gates <br /> The existing light has a flat surface which can provide a space for birds to nest, resulting in the need for regular cleanup. The <br /> proposed light has an elliptical bop that deters birds tiom nesting on it. <br /> 2220 - Plani new trees at golf course <br /> 't'hese tress were requested by the owners of Fiddler's Green golf course as remediation for the trees that had to be removed <br /> &ora their property to clear the approach surface for Rwy 16L. <br /> 2230 - Add electrical vaults at Airport Road <br /> Eugene Power and Electric Board (EWEB) reviewed the existing design and requested two additiotral vaults for the work to <br /> conform to their typical standards. <br /> 1240 - Add new vault at rotating beacon <br /> An additional vault was required to accommodate the large number of existing conduits in this area. <br /> 2250 - Change fiber opdcc cable <br /> The Airport requested that 12-strand fiber optic cable be used rethar than the specified 6-strand cable to prevent damage due to <br /> bcrsding and future work in the vaults <br /> 2260 - Add access road <br /> When the A-1 channel was rerouted, assecc was cut off to a portion of the existing airport property that is leased to a local <br /> farmer. An new access road was required for tbe fattr~er to gain access to the field. <br /> 3 <br /> <br />