<br /> 09/19/2005 15:55 FA}~ 541 682 6030 CITY EUGENE Pw ENG f~002/004 <br /> Page 2 of 4 ~ <br /> . AIRPORT Eu ene ort -Parallel DATE 4/28/05 <br /> Ranwlt Pro eM <br /> LOCATION Eugene, Oregon A~ PROJECT NO. 3-~1-0018-33/34 u <br /> Job No. 4183 <br /> CONTRACTOR Wlldish Constructiop Co. Chan a Order 10 <br /> JUSTYFICATION FOR CHANGE <br /> 1. Brief desclti»tion of the nronosed contract change(s) and location(s) <br /> 2180 • Add ~-lact tad bills to condnlt <br /> Add 4-ineh end bells to all flinch conduit termmnations at a vault <br /> 2190 - Funedonal Lnprovemeats to the Electrical Bullding <br /> Add 2-inch cad bells to all 4-inch conduit terminations at a vault <br /> 2200 -Change outside light at the Electrical Vault <br /> Replace existing outside light at the northwest corner of the Electrical Vault to a G3 Area Luininairc. <br /> 2210 • Change ousdide light at gates <br /> Change light at gates to G3 Area Luminaire and pole at gates to 18-foot aluminum square pole and 4-foot AFG <br /> pole base <br /> 2220 -Plant sew trees at golf coarse <br /> Plant four new trees at Golf Course. Trees are to be 8 to 10.foot tall Leyland Cypress. <br /> 2230 - Add dectrical vaults at Airport Road <br /> Add two I,A 575 vaults at Airport Road for EWEB to underground power. <br /> 2?AO - Add sew vault at rotatiag beacon <br /> Add, vault for fiber at the rotating beacon <br /> 2250 - Change fiber optics cable <br /> Chaage fiber optics cable tmrn 6-strand to 12-strand <br /> 2260 - Add access road <br /> Add access rood for farming access north of box culvert <br /> 2 <br /> <br />