New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4183 CO 6
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2008
>
GJN4183 CO 6
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/16/2008 4:50:46 PM
Creation date
6/25/2008 10:46:06 AM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Contracts
PW_Active
Yes
External_View
No
GJN
004183
GL_Project_Number
945202
Identification_Number
2004100581
COE_Contract_Number
2004-00024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
i <br /> <br /> { ' . i , <br /> Page 2 of 10 <br /> AIRPORT Eu ene Air ort -Parallel DATE 2/8/05 <br /> Runwa Pro ect <br /> LOCATION Eugene, Oregon AIP PROJECT NO. 3-41-0028-33/34 <br /> Job No. 4183 <br /> CONTRACTOR Wildish Construction Co. Chan a Order 6 <br /> JUSTIFICATION FOR CHANGE <br /> 1. Brief description of the proposed contract change(s) and location(s). <br /> Item 2080 -Flashing is to be added at the base of the block wall around the perimeter of the electrical building (reference <br /> V 10 of 124). <br /> Item 2090 -The electrical meters and current transformers are to be removed from the primary and secondary source <br /> transformers and relocated on the outside of the east wall of the electrical building (reference sheet V25 of 124). <br /> Item 2100 - An additional fire extinguisher is to be added in the electrical building (reference note 14 on sheet V2 of 124). <br /> Item 2110 -The 4-inch slab under the storage rack in the regulator room inside the electrical building is to be changed to a <br /> 5-inch slab (reference sheet V 13 of 124). <br /> Item 2120 -The canopy mounting (reference sheet V 11 of 124) <br /> 2.. Reason(s) for the change(s) (Continue on reverse if necessary) <br /> Item 2080 -The Ci of Eu ene buildin ms ector reviewed the drawin s after the were bid and re uued flashin <br /> tY g g~ P g Y q~ g. <br /> insulation, and protection board be added at the base of the blocks. It will be necessary to saw cut a slot in each block to <br /> receive the flashing and hold it in place. Refer to the attached sheet entitled Change Order EV-O1 for a detailed breakdown <br /> of cost. <br /> Item 2090 -Sheet V25 of 124 shows the electrical meters and current transformers attached to the Eugene Water and <br /> Electric Board (EWEB) primary and secondary source transformers. EWEB does not allow the electrical meters and <br /> current transformers to be attached to their primary and secondary source transformers. To satisfy EWEB, we propose to <br /> relocate the electrical meters and current transformer cans to the east wall of the electrical building. Refer to the attached <br /> sheet entitled Change Order EV-02 for a detailed breakdown of cost. <br /> Item 2100 -The City of Eugene building inspector reviewed the drawings after they were bid and required an additional fire <br /> extinguisher be added to the electrical building. Refer to the attached sheet entitled Change Order EV-03 for a detailed <br /> breakdown of cost. <br /> Item 2110 -The City of Eugene building inspector reviewed the drawings after they were bid and questioned if the 4-inch <br /> thick slab was adequate for seismic load under the storage rack in the generator room of the electrical building. After <br /> reviewing the calculations, the Engineer of record concluded that the slab should be 5-inches thick rather than 4-inches <br /> thick. Refer to the attached sheet entitled Change Order EV-04 for a detailed breakdown of cost. <br /> Item 2120 - Sheet V 11 of 124 shows details for the plates to be used to mount the canopy to the wall of the electrical <br /> building. Sheet VS of 124 shows that the center mounting bracket for the canopy on the south and north side of the building <br /> interferes with the internal wall. It will be necessary to manufacture new plates that are wide enough for the bolts to clear <br /> the wall and to provide enough room to install the nut and washer. Refer to the attached sheet entitled Change Order EV-07 <br /> for a detailed breakdown of cost. <br /> 2 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.