<br /> 02/11/2005 10:33 FAX 5~1 682 6030 CITY EUGENE Pw ENG f~j001/001 <br /> Page 1 of 3 <br /> CONTRACT GRANGE ORDER NO. 4 <br /> or <br /> SUPPLEMENTAL AGREEMENT NO. <br /> AIRPORT Eu eae Air ort -Parallel BATE 11/29/04 <br /> Ranwa Pro'ect <br /> LOCATION Eggene, Oregon AYP PROJECT NO. 3~1-0028-33/34 <br /> Job No. 4183 <br /> CONTRACTOR Wildish Construction Co. Chan a Order 4 <br /> You are requested to perform the following described work upon receipt of an approved copy of this <br /> doetunent or as directed by the engineer: <br /> Item Unit Price <br /> No. Descri tioa Unit uanti Amount <br /> Install asphalt patch at the intersection o[ L.S. S8,036.00 1 58,036.00 <br /> 2040 the service road and the new sanitary <br /> server Iine, the Intersection of the service <br /> road and the new East-W~st elccMeal <br /> duct, aad the intersection of Hollis Iane <br /> and the new East-West elecWcal duct.. <br /> Credit for not extendinE the sanitary L.S. (51,700.00) 1 (S1,700.00) <br /> 2050 sewer across Green Hill Read. <br /> Rewire sign circuit aad replace oae edge EA 537415 1 5374.15 <br /> 2060 light oa Runway 3/21 at the intersection of <br /> RunWA 3/21 and the new electrical duct. <br /> This Chan a Order Toted 5 6 710.15 <br /> Previous Chan a Order a Totai S 99 832.W <br /> Revised CoatraCt Total S 16 695 717.90 <br /> The time provided for eowpletion in the contract is unchanged. This document shall become an amendment to the eonoract <br /> aad all provisions of the contract will apply. <br /> Recommended by: <br /> /1/~~af <br /> Engineer Q Z r D e ~ <br /> A roved b / i y <br /> Owaer / Date <br /> Acce ted b ~/Z~f ~ <br /> Con cto D to <br /> Coacurred b o o>e <br /> ede Aviation A min anon D <br /> -5~o <br /> NOTT: Chaage Orders and Supplernen Agreements require approval prior to construction, otherwise no Federal <br /> participation eaa be granted. State Aeronautics concurrence is required when state participation is anticipated. <br /> Ste- q3~S C.FI~~s X55 ~Z <br /> <br />