New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4183 CO 3
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2008
>
GJN4183 CO 3
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/16/2008 4:51:05 PM
Creation date
6/25/2008 10:44:18 AM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Contracts
PW_Active
Yes
External_View
No
GJN
004183
GL_Project_Number
945202
Identification_Number
2004100581
COE_Contract_Number
2004-00024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
4 Concrete Encasement of Electrical <br /> <br /> . Conduit Under Pavement <br /> 2" 1 way (Tzy B crossings and Threshold LF $4.97 932 $4,632.04 <br /> Lights) <br /> 3" 1 way (Rwy 3/21 and Try C) LF $8.26 390 $3,221.40 <br /> 2" 2 way (Txy crossing nett to Rwy) LF $7.45 724 $5,393.80 <br /> 4" 2 way (TYy B) LF $11.72 810 $9,493.20 <br /> 4" 3 way (Tky B and C, Rwy 3/21 and LF $14.64 625 $9,150 <br /> 16L/34R) <br /> 4" 4 way (16L/34R) LF $17.57 220 $3,865.40 <br /> 4" 6 way ('15cy B and C, and Rwy 3/21) LF $19.96 400 $7,984.00 <br /> Concrete Encasement of EWEB pipe over LS $575 1 $575.00 <br /> storm drains <br /> vrt'~'~ ~ 3 ! 4, S 4' <br /> 5 Hollis Crossing <br /> 120 feet of 12-inch ADS Pipe at ditch LF $35.56 120 54,267.20 <br /> crossing <br /> 240 feet 4-inch PVC plus fitting LF $4.80 240 $1,152.00 <br /> Concrete Encasement of Pipe over new LS $3,990 1 $3,990.00 <br /> drains and old storm drains <br /> Night Work Differential Rwy 3/21 Safety LS $2,128 1 $ 2,128.00 <br /> Area including barricades and light <br /> towers <br /> o-to.e_ 5 ~ l 153 dZo <br /> This Chan a Order~Total $ 66 230.04 <br /> Previous Chan a Orde s Total $ 33 602.00 <br /> Revised Contract Total $16,689,007.75 <br /> The time provided for completion in the contract is (unchanged) (decreased) (increased) by Unchanged <br /> working days. This document shall become an amendment to the contract and all provisions of the <br /> contract will apply. Changes are shown on Dr s) No. ~ dated three copies attached. <br /> Recommended by: William Ness 10/18/04 <br /> Engineer Date <br /> Approved by: oft ~ 3 0 y z ~ <br /> Owner Da <br /> Accepted by: o <br /> ~ Contractor ate <br /> Concurred by: <br /> State Aeronautics (if plicable) e <br /> Approved by: Suzanne LePang ~/(~(DIYIYI.CO wl-~'j~ _ 6~ <br /> Federal Aviati~o/n Administratio Date <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.